Analysis and Back-Analysis for Temperature Field of Concrete Arch Dam During Construction Period Based on Temperature Data Measured by DTS

被引:32
作者
Su, Huaizhi [1 ,2 ]
Li, Jinyou [3 ]
Hu, Jiang [3 ]
Wen, Zhiping [4 ]
机构
[1] Hohai Univ, State Key Lab Hydrol Water Resources & Hydraul En, Nanjing 210098, Jiangsu, Peoples R China
[2] Hohai Univ, Coll Water Conservancy & Hydropower Engn, Nanjing 210098, Jiangsu, Peoples R China
[3] Natl Engn Res Ctr Water Resources Efficient Utili, Nanjing 210098, Jiangsu, Peoples R China
[4] Nanjing Inst Technol, Dept Comp Engn, Nanjing 211167, Jiangsu, Peoples R China
基金
中国国家自然科学基金;
关键词
Arch dam; inverse problems; optical fiber sensors; safety; temperature measurement;
D O I
10.1109/JSEN.2012.2227468
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Based on the observed temperature information of arch dam, the mathematical and mechanical methods are combined usually with dam engineering theory to capture in real time and evaluate in time the developing status and space-time distribution of arch dam temperature, and implement the back analysis for temperature control measures. It is an important step for dam construction and safe operation. Some methods, namely transient temperature-field simulation, thermodynamic parameters back-calculation, and model correction, are used synthetically to solve the above problem. A method is proposed to back calculate the thermodynamic parameters of arch dam by use of the temperature data obtained by the distributed optical fiber temperature sensor (DTS). A problem is studied to couple the simulated temperature field by finite element method (FEM) and the observed temperature field by the DTS. A method is presented to update dynamically the FEM model on the basis of the observed temperature field. An actual engineering is analyzed by the proposed method. It is shown that the DTS system can implement the real-time observation of concrete arch dam temperature field. According to the observed temperature field by the DTS and the updated numerical simulation model of the temperature field, scientific guidance can be given during the pouring process of the arch dam, and reliable data can be provided to analyze and evaluated arch dam safety.
引用
收藏
页码:1403 / 1412
页数:10
相关论文
共 15 条
[1]   The effect of construction designs on temperature field of a roller compacted concrete dam - a simulation analysis by a finite element method [J].
Chen, YL ;
Wang, CJ ;
Li, SY ;
Chen, LJ .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2003, 30 (06) :1153-1156
[2]   A strain energy-based damage severity correction factor method for damage identification in plate-type structures [J].
Fan, Wei ;
Qiao, Pizhong .
MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2012, 28 :660-678
[3]   Automatic Monitoring System for Singularity Detection in Dikes By DTS Data Measurement [J].
Khan, Amir A. ;
Vrabie, Valeriu ;
Mars, Jerome I. ;
Girard, Alexandre ;
D'Urso, Guy .
IEEE TRANSACTIONS ON INSTRUMENTATION AND MEASUREMENT, 2010, 59 (08) :2167-2175
[4]   Long-term thermal two- and three-dimensional analysis of roller compacted concrete dams supported by monitoring verification [J].
Kuzmanovic, Vladan ;
Savic, Ljubodrag ;
Stefanakos, John .
CANADIAN JOURNAL OF CIVIL ENGINEERING, 2010, 37 (04) :600-610
[5]   Recent applications of fiber optic sensors to health monitoring in civil engineering [J].
Li, HN ;
Li, DS ;
Song, GB .
ENGINEERING STRUCTURES, 2004, 26 (11) :1647-1657
[6]   ADVANCES TOWARD FIBER OPTIC BASED SMART STRUCTURES [J].
MEASURES, RM .
OPTICAL ENGINEERING, 1992, 31 (01) :34-47
[7]   Fiber Optic Sensors in Structural Health Monitoring [J].
Miguel Lopez-Higuera, Jose ;
Rodriguez Cobo, Luis ;
Quintela Incera, Antonio ;
Cobo, Adolfo .
JOURNAL OF LIGHTWAVE TECHNOLOGY, 2011, 29 (04) :587-608
[8]   Structural Health Monitoring in mainland China: Review and Future Trends [J].
Ou, Jinping ;
Li, Hui .
STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2010, 9 (03) :219-231
[9]  
Rahimi A., 2011, Australian Journal of Basic and Applied Sciences, V5, P2761
[10]  
Shouyi Li, 2008, International Water Power and Dam Construction, V60, P16