The challenges of integrated performance measurement systems Integrating mechanisms for integrated measures

被引:39
作者
Giovannoni, Elena [1 ]
Maraghini, Maria Pia [1 ]
机构
[1] Univ Siena, Dept Business & Law, I-53100 Siena, Italy
来源
ACCOUNTING AUDITING & ACCOUNTABILITY JOURNAL | 2013年 / 26卷 / 06期
关键词
Performance measurement; Garment industry; Small to medium-sized enterprises; Italy; Performance measurement systems; Development process; Integrating mechanisms; Integrated measures; Italian company; Creativity; MANAGEMENT CONTROL-SYSTEMS; PRODUCT DEVELOPMENT; EVOLUTION; INSIGHTS; DESIGN;
D O I
10.1108/AAAJ-04-2013-1312
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - The purpose of this paper is to explore some of the challenges involved in the development of integrated performance measurement systems (PMS). In particular, given the difficulties involved in the development process, and the "inherent incompleteness" of PMS, the authors seek to investigate whether and how these difficulties may challenge the integrating role of PMS and the eventual influence of alternative integrating mechanisms on this role. Design/methodology/approach - The paper combines studies on PMS with empirical findings related to Monnalisa, a medium-sized Italian family firm, which designs and sells children's wear and accessories. Over the last ten years Monnalisa has adopted various design frameworks (such as the balanced scorecard and the integrated report) for integrated PMS. Through an analysis of the PMS development process within the company, the authors explore the challenges involved in this process. Findings - In the case of Monnalisa, despite the adoption of a design framework for integrated PMS, various critical issues emerged during the implementation phase, mainly as a consequence of tensions between different performance dimensions and the need for creativity. While these critical issues compromised the integrating role of PMS, alternative integrating mechanisms (such as the direct intervention of the founder and social interaction) were stimulated and worked alongside PMS in achieving organizational integration. In so doing, these mechanisms operated in different ways, by complementing incomplete PMS when they were failing to achieve organizational integration, or improving their integrated nature. Originality/value - Although the literature acknowledges some of the challenges involved in PMS development, understanding how to manage these challenges and how they actually affect PMS require further investigation. This paper provides new insights on the challenges involved in the development process (particularly in relation to the tensions caused by creativity, unpredictability, time gaps between operations and targets, as well as the distinct priorities of different levels of customers), and on the role played by alternative integrating mechanisms in the management of these challenges. While the founder's direct intervention may be peculiar to the context of medium-sized enterprises, the role played by social integrating mechanisms suggests potential ways to overcome the challenges of integrated PMS also within larger firms.
引用
收藏
页码:978 / 1008
页数:31
相关论文
共 50 条
  • [41] An integrated AHP-based scheme for performance measurement in humanitarian supply chains
    Anjomshoae, Ali
    Hassan, Adnan
    Wong, Kuan Yew
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2019, 68 (05) : 938 - 957
  • [42] An Integrated Throughflow Method for the Performance Analysis of Variable Cycle Compression Systems
    Liu, Baojie
    Jia, Shaofeng
    Yu, Xianjun
    INTERNATIONAL JOURNAL OF TURBO & JET-ENGINES, 2021, 38 (03) : 245 - 261
  • [43] Novel techniques to enhance the performance of Stirling engines integrated with solar systems
    Al-Nimr, Moh'd
    Khashan, Saud A.
    Al-Oqla, Hashem
    RENEWABLE ENERGY, 2023, 202 : 894 - 906
  • [44] INTEGRATED MANAGEMENT SYSTEMS FOR BETTER ENVIRONMENTAL PERFORMANCE AND SUSTAINABLE DEVELOPMENT - A REVIEW
    Samy, Gopalakrishnan Muthu
    Samy, Chandramohan Palani
    Ammasaiappan, Maheswari
    ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2015, 14 (05): : 985 - 1000
  • [45] The development, implementation and maintenance of integrated performance management systems, with special reference to practical closed-loop continuous improvement mechanisms
    Coetzee, D
    6TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL XX, PROCEEDINGS EXTENSION, 2002, : 13 - 18
  • [46] Integrated Power and Thermal Management Systems for Civil Aircraft: Review, Challenges, and Future Opportunities
    Ouyang, Zeyu
    Nikolaidis, Theoklis
    Jafari, Soheil
    APPLIED SCIENCES-BASEL, 2024, 14 (09):
  • [47] Performance measurement and management systems: state of the art, guidelines for design and challenges
    Taticchi, Paolo
    Balachandran, Kashi
    Tonelli, Flavio
    MEASURING BUSINESS EXCELLENCE, 2012, 16 (02) : 41 - 54
  • [48] Performance measurement systems in auditing firms Challenges and other behavioural aspects
    Hegazy, Mohamed
    Tawfik, Myada
    JOURNAL OF ACCOUNTING IN EMERGING ECONOMIES, 2015, 5 (04) : 395 - 423
  • [49] Integrated resource efficiency: measurement and management
    Koh, S. C. L.
    Morris, Jonathan
    Ebrahimi, Seyed Mohammad
    Obayi, Raymond
    INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2016, 36 (11) : 1576 - 1600
  • [50] Integrating intellectual capital disclosure in an integrated thinking perspective
    Tonelli, Alberto
    Rizzato, Fabio
    Busso, Donatella
    Devalle, Alain
    JOURNAL OF INTELLECTUAL CAPITAL, 2024, 25 (2/3) : 588 - 612