The challenges of integrated performance measurement systems Integrating mechanisms for integrated measures

被引:39
作者
Giovannoni, Elena [1 ]
Maraghini, Maria Pia [1 ]
机构
[1] Univ Siena, Dept Business & Law, I-53100 Siena, Italy
来源
ACCOUNTING AUDITING & ACCOUNTABILITY JOURNAL | 2013年 / 26卷 / 06期
关键词
Performance measurement; Garment industry; Small to medium-sized enterprises; Italy; Performance measurement systems; Development process; Integrating mechanisms; Integrated measures; Italian company; Creativity; MANAGEMENT CONTROL-SYSTEMS; PRODUCT DEVELOPMENT; EVOLUTION; INSIGHTS; DESIGN;
D O I
10.1108/AAAJ-04-2013-1312
中图分类号
F8 [财政、金融];
学科分类号
0202 ;
摘要
Purpose - The purpose of this paper is to explore some of the challenges involved in the development of integrated performance measurement systems (PMS). In particular, given the difficulties involved in the development process, and the "inherent incompleteness" of PMS, the authors seek to investigate whether and how these difficulties may challenge the integrating role of PMS and the eventual influence of alternative integrating mechanisms on this role. Design/methodology/approach - The paper combines studies on PMS with empirical findings related to Monnalisa, a medium-sized Italian family firm, which designs and sells children's wear and accessories. Over the last ten years Monnalisa has adopted various design frameworks (such as the balanced scorecard and the integrated report) for integrated PMS. Through an analysis of the PMS development process within the company, the authors explore the challenges involved in this process. Findings - In the case of Monnalisa, despite the adoption of a design framework for integrated PMS, various critical issues emerged during the implementation phase, mainly as a consequence of tensions between different performance dimensions and the need for creativity. While these critical issues compromised the integrating role of PMS, alternative integrating mechanisms (such as the direct intervention of the founder and social interaction) were stimulated and worked alongside PMS in achieving organizational integration. In so doing, these mechanisms operated in different ways, by complementing incomplete PMS when they were failing to achieve organizational integration, or improving their integrated nature. Originality/value - Although the literature acknowledges some of the challenges involved in PMS development, understanding how to manage these challenges and how they actually affect PMS require further investigation. This paper provides new insights on the challenges involved in the development process (particularly in relation to the tensions caused by creativity, unpredictability, time gaps between operations and targets, as well as the distinct priorities of different levels of customers), and on the role played by alternative integrating mechanisms in the management of these challenges. While the founder's direct intervention may be peculiar to the context of medium-sized enterprises, the role played by social integrating mechanisms suggests potential ways to overcome the challenges of integrated PMS also within larger firms.
引用
收藏
页码:978 / 1008
页数:31
相关论文
共 50 条
  • [31] Integrated performance measurement system for firm's human capital building
    Rompho, Bunjongjit
    Siengthai, Sununta
    JOURNAL OF INTELLECTUAL CAPITAL, 2012, 13 (04) : 482 - +
  • [32] Energy performance of integrated adaptive envelope systems for residential buildings
    Dehwah, Ammar H. A.
    Krarti, Moncef
    ENERGY, 2021, 233
  • [33] Thermal model for performance prediction of integrated collector storage systems
    Garnier, C.
    Muneer, T.
    Currie, J.
    JOURNAL OF RENEWABLE AND SUSTAINABLE ENERGY, 2011, 3 (01)
  • [34] Models of an Integrated Performance Measurement System of Intelligent and Sustainable Supply Chains
    Tundys, Blanka
    Rzeczycki, Andrzej
    Ziolo, Magdalena
    Jankowski, Jaroslaw
    INTELLIGENT INFORMATION AND DATABASE SYSTEMS, PT II, 2014, 8398 : 504 - 514
  • [35] Integrated performance measurement to support strategic decision making in engineering organisations
    Davis, J. P.
    MacDonald, A. D. J.
    Marashi, S. E.
    2007 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1-4, 2007, : 1762 - +
  • [36] Adoption of the performance measurement system in the Nigerian public sector: Challenges and prospects
    Abubakar, Abdulkadir
    Saidin, Siti Zabedah
    Ahmi, Aidi
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON ACCOUNTING STUDIES (ICAS) 2015, 2015, : 214 - 220
  • [37] Exploring the generative power of performance measurement systems design
    Giovannoni, Elena
    Quarchioni, Sonia
    BRITISH ACCOUNTING REVIEW, 2019, 51 (02) : 211 - 225
  • [38] Using integrated process data of longwall shearers in data warehouses for performance measurement
    Erkayaoglu, Mustafa
    Dessureault, Sean
    INTERNATIONAL JOURNAL OF OIL GAS AND COAL TECHNOLOGY, 2017, 16 (03) : 298 - 310
  • [39] An integrated AHP-based scheme for performance measurement in humanitarian supply chains
    Anjomshoae, Ali
    Hassan, Adnan
    Wong, Kuan Yew
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2019, 68 (05) : 938 - 957
  • [40] A performance measurement of three dimensional integrated solar PV system in Indian Conditions
    Taneja, Harshal
    Lour, Manish
    Sharma, Kartike
    Tailor, Saurabh
    Singh, Pushpendra
    Pandey, Akhilesh Kumar
    Bhaduri, Shishir Chandra
    2017 INNOVATIONS IN POWER AND ADVANCED COMPUTING TECHNOLOGIES (I-PACT), 2017,