An adaptation of the EOQ formula for JIT quasi-pull system production

被引:8
作者
Chiarini, Andrea [1 ]
机构
[1] Univ Ferrara, Dept Econ & Management, Voltapaletto 11, I-44121 Ferrara, Italy
关键词
EOQ; EPQ; JIT; pull system; balanced processes; lot size; JUST-IN-TIME; PROCESS IMPROVEMENT; KANBAN; SETUPS; MODEL; PUSH;
D O I
10.1080/09537287.2016.1237687
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This research demonstrates for the first time that in a just-in-time (JIT) quasi-pull production environment, a model adapted from the Economic Order Quantity and made up of two specific formulas can be employed for calculating an optimised lot size. The assumptions of our model are: a low level of defects, and insignificant shortage backordering and failure of the equipment. JIT quasi-pull production is the state typically reached by many manufacturing companies because it is almost impossible to achieve zero set-ups and zero work-in-process (WIPs) even in the best Lean Production implementations. In this model, finished products are shipped at once in a JIT way. The two developed formulas are specialised: one for balanced stations/processes and the other for unbalanced stations; the formulas allow calculation of an optimised lot size. Several applications of the formulas have been tested and discussed through a case study. Findings demonstrated that the optimised quantity of a lot size has to be smaller than the customer's daily demand for the product. Moreover, in case of unbalanced stations with long cycle times, the formula forces the company to reduce its set-up times and the cycle times. The new model will be of interest to practitioners who are seeking a way to balance the costs of set-ups and the cost of holding some WIPs and offers interesting avenues for new research.
引用
收藏
页码:123 / 130
页数:8
相关论文
共 52 条
[1]   Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study [J].
Abdulmalek, Fawaz A. ;
Rajgopal, Jayant .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 107 (01) :223-236
[2]   Development of a multi-product cost and value stream modelling methodology [J].
Agyapong-Kodua, K. ;
Ajaefobi, J. O. ;
Weston, R. H. ;
Ratchev, S. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (22) :6431-6456
[3]   Some structural properties for the just-in-time level schedule problem [J].
Aigbedo, H .
PRODUCTION PLANNING & CONTROL, 2000, 11 (04) :357-362
[4]   Kanban supplier system as a standardisation method and WIP reduction [J].
Ali, Ahad ;
Santini, Neriliz ;
Rahman, Mohammad Anwar .
International Journal of Industrial and Systems Engineering, 2012, 11 (1-2) :179-188
[5]   Single item lot sizing problems [J].
Brahimi, N ;
Dauzere-Peres, S ;
Najid, NM ;
Nordli, A .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 168 (01) :1-16
[6]  
Chi Anh Phan, 2010, International Journal of Productivity and Quality Management, V6, P23
[7]  
Chiarini Andrea, 2015, International Journal of Productivity and Quality Management, V16, P416
[8]  
Chiarini Andrea, 2013, International Journal of Productivity and Quality Management, V12, P345
[9]  
Chiarini Andrea, 2013, International Journal of Productivity and Quality Management, V11, P179
[10]   Waste savings in patient transportation inside large hospitals using lean thinking tools and logistic solutions [J].
Chiarini, Andrea .
LEADERSHIP IN HEALTH SERVICES, 2013, 26 (04) :356-367