Fuzzy scheduling of a non-isolated micro-grid with renewable resources

被引:18
作者
Banaei, Mohsen [1 ]
Rezaee, Babak [2 ]
机构
[1] Ferdowsi Univ Mashhad, Fac Engn, Elect Engn Dept, POB 91775-1111, Mashhad, Iran
[2] Ferdowsi Univ Mashhad, Fac Engn, Ind Engn Dept, POB 91775-1111, Mashhad, Iran
关键词
Distributed energy resources; Renewable resources; Fuzzy sets; Day-ahead scheduling; Fuzzy linear programming; OPTIMIZATION; OPERATION;
D O I
10.1016/J.renene.2018.01.088
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper proposes a new energy management scheduling model for optimizing operation costs of a non-isolated micro-grid. It's assumed that the micro-grid includes some renewable energy resources like wind turbines and photovoltaic panels, fuel cell, and energy storage systems, and is connected to the macro-grid through a distributed transmission line with limited capacity. Different possible uncertainties associated with different elements of the micro-grid like forecasted outputs of renewable resources, a maximum capacity of the fuel cell and batteries, a maximum capacity of distributed line and hourly demands are considered in the proposed model. Fuzzy sets concept is used to model these uncertainties in the micro-grid and a three stage optimization method is applied to find the optimal scheduling of the micro-grid under the uncertainties. The proposed method is implemented to a real case study. Impacts of variations in each element of the micro-grid and its associated uncertainty on the results are investigated through a sensitivity analysis. (C) 2018 Elsevier Ltd. All rights reserved.
引用
收藏
页码:67 / 78
页数:12
相关论文
共 21 条
[1]  
[Anonymous], DISTRIBUTED VS CENTR
[2]  
[Anonymous], 2013, P 18 EL POW DIST C
[3]  
[Anonymous], INT J APPL OPER RES
[4]  
Bellman R. E., 1971, Decision-making in a fuzzy environment, DOI 10.1287/mnsc.17.4.B141
[5]   Energy management strategy based on short-term generation scheduling for a renewable microgrid using a hydrogen storage system [J].
Cau, Giorgio ;
Cocco, Daniele ;
Petrollese, Mario ;
Kaer, Soren Knudsen ;
Milan, Christian .
ENERGY CONVERSION AND MANAGEMENT, 2014, 87 :820-831
[6]  
Effati S, 2010, APPL APPL MATH, V5, P504
[7]   Fuzzy Optimization for the Operation of Electric Vehicle Parking Lots [J].
Faddel, Samy ;
Al-Awami, Ali T. ;
Abido, M. A. .
ELECTRIC POWER SYSTEMS RESEARCH, 2017, 145 :166-174
[8]   Fuzzy day-ahead scheduling of virtual power plant with optimal confidence level [J].
Fan, Songli ;
Ai, Qian ;
Piao, Longjian .
IET GENERATION TRANSMISSION & DISTRIBUTION, 2016, 10 (01) :205-212
[9]   Optimization in microgrids with hybrid energy systems - A review [J].
Fathima, A. Hina ;
Palanisamy, K. .
RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2015, 45 :431-446
[10]   Possibilistic linear programming:: a brief review of fuzzy mathematical programming and a comparison with stochastic programming in portfolio selection problem [J].
Inuiguchi, M ;
Ramík, J .
FUZZY SETS AND SYSTEMS, 2000, 111 (01) :3-28