共 20 条
- [11] Kang MW, 2008, PUBLIC WORKS MANAGEM, V13, P1
- [12] Koakutsu S, 1996, P 5 ACM SIGDA PHYS D, P134
- [14] Delay estimation and optimal length for four-lane divided freeway workzones [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1996, 122 (02): : 114 - 122
- [15] McCoy P.T., 1980, Transportation Research Record 773, P20
- [16] Optimum length of single-lane closures in work zones on rural four-lane freeways [J]. 1998 TRB DISTINGUISHED LECTURE, PT 1/MAINTENANCE CHALLENGES AND SAFETY ISSUES, PT 2, 1998, (1650): : 55 - 61
- [17] Optimal work zone lengths for two-lane highways [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 1999, 125 (01): : 21 - 29
- [19] Tien SL, 2006, TRANSP RES BOARD ANN
- [20] Wolsey LA., 1998, INTEGER PROGRAMMING