Optimal subwork zone operational strategy for short-term work zone projects in four-lane two-way freeways

被引:13
作者
Meng, Qiang [1 ]
Weng, Jinxian [1 ]
机构
[1] Natl Univ Singapore, Dept Civil Engn, Singapore 117576, Singapore
关键词
work zone; traffic delay; costs; genetic simulated annealing; tree-trimming; OPTIMIZATION; HIGHWAYS; LENGTHS; DELAY; MODEL;
D O I
10.1002/atr.153
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Roadside trees in Singapore are regularly trimmed for the purpose of traffic safety and roadside tree-trimming project is one typical type of short-term work zone projects. To implement such a short-term work zone project, contractors usually divide an entire work zone into multiple subwork zones with the uniform length. This paper aims to determine an optimal subwork zone strategy for the short-term work zone projects in four-lane two-way freeways with time window and uniform subwork zone length constraints. The deterministic queuing model is employed to estimate total user delay caused by the work zone project by taking into account variable traffic speeds. Based on the user delay estimations, this paper proceeds to build a minimization model subject to time window and uniform length constraints for the optimal subwork zone strategy problem. This paper also presents a variation of the minimization model to examine the impact of unequal subwork zone length constraint. Since these minimization models belong to the mixed-integer non-differentiable optimization problems, an iterative algorithm embedding with the genetic simulated annealing method is thus proposed to solve these models. Finally, a numerical example is carried out to investigate the effectiveness of the proposed models. Copyright (c) 2010 John Wiley & Sons, Ltd.
引用
收藏
页码:151 / 169
页数:19
相关论文
共 20 条
  • [1] [Anonymous], 2003, MAN UN TRAFF CONTR D
  • [2] [Anonymous], HIGHW CAP MAN HCM
  • [3] An applicatoin of an optimal traffic control during lane closure periods of a two-lane road
    Ceder, A
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 2000, 34 (02) : 173 - 190
  • [4] A macroscopic traffic model for highway work zones: Formulations and numerical results
    Chang, Gang-len
    Zhu, Zuojin
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 2006, 40 (03) : 265 - 287
  • [5] Chen C. H., 2006, TRANSP RES BOARD ANN
  • [6] Chen CH, 2005, TRANSPORT RES REC, P51
  • [7] Optimal work zone lengths for four-lane highways
    Chien, S
    Schonfeld, P
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2001, 127 (02): : 124 - 131
  • [8] Simulation-based estimates of delays at freeway work zones
    Chien, SIJ
    Goulias, DG
    Yahalom, S
    Chowdhury, SM
    [J]. JOURNAL OF ADVANCED TRANSPORTATION, 2002, 36 (02) : 131 - 156
  • [9] Janson B.N., 1987, Transp. Res. Rec, V1132, P34
  • [10] Freeway work zone traffic delay and cost optimization model
    Jiang, XM
    Adeli, H
    [J]. JOURNAL OF TRANSPORTATION ENGINEERING, 2003, 129 (03) : 230 - 241