Anti-interference adaptive single-phase auto-reclosing schemes based on reactive power characteristics for transmission lines with shunt reactors

被引:16
|
作者
Xie, Chao [1 ]
Li, Fengting [1 ]
Wang, Bin [2 ]
Fan, Yanfang [1 ]
Jing, Liuming [2 ]
Chen, Weiwei [3 ]
Wang, Cong [1 ]
机构
[1] Xinjiang Univ, Urumqi, Xinjiang, Peoples R China
[2] Tsinghua Univ, Beijing, Peoples R China
[3] State Grid Xinjiang Elect Power Co Ltd, Econ Res Inst, Xinjiang, Peoples R China
基金
中国国家自然科学基金;
关键词
Adaptive single-phase auto-reclosing scheme; Faulty phase; Frequency components ratio; Reactive power; Shunt reactor; Transient fault identification method; AUTORECLOSURE SCHEME; TRANSIENT STABILITY;
D O I
10.1016/j.epsr.2019.01.019
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper proposes two anti-interference adaptive single-phase auto-reclosing (ASPAR) schemes for transmission lines with shunt reactors. This approach is based on faulty phase reactive power characteristics. Instantaneous power algorithm (IPA) is used to calculate the reactive power using voltage and current measurements at only one end of the transmission line. After fault extinction, faulty phase reactive power magnitude rapidly rises and can be divided into five frequency components, hence, magnitude and frequency components ratio are used to identify fault extinction time. Integral processes are included in IPA, for this reason, the proposed ASPAR schemes possess anti-interference capability, and it can be used on wind power outgoing lines with multiple kind of interference often. The proposed approach considers various transmission lines interferences: rapid transmit power fluctuation and external lightning strike. Influences of high frequency disturbance and wind power plants low voltage ride through (LVRT) process were also taken into account. The proposed ASPAR schemes is extensively investigated on a typical wind power outgoing line, Hami, Xinjiang, China via the simulation platform PSCAD/EMTDC 4.5.0.0. Different cases are studied considering rapid transmit power fluctuation and external lightning strike. The simulation results ensure the validity and feasibility of the proposed ASPAR schemes on transmission lines with and without much interference. Besides, the robustness of the proposed ASPAR schemes against varied fault location and transition resistance is also verified.
引用
收藏
页码:176 / 183
页数:8
相关论文
共 50 条
  • [1] An adaptive single-phase auto-reclosing scheme based on the Hausdorff distance algorithm for transmission lines with shunt reactors
    Liu, Yangsheng
    Dou, Kun
    Xie, Xing
    Huang, Zebo
    Luo, Yi
    Tang, Tao
    Liang, Haonan
    COMPUTERS & ELECTRICAL ENGINEERING, 2025, 122
  • [2] A novel phasor-based adaptive single-phase auto-reclosing scheme for transmission lines with shunt reactors
    Liu, Yangsheng
    Dou, Kun
    Xie, Xing
    Huang, Zebo
    Huang, Qian
    Guo, Zhenwei
    Luo, Yi
    Tang, Tao
    ELECTRICAL ENGINEERING, 2024, 106 (06) : 7231 - 7245
  • [3] Adaptive Single-Phase Auto-Reclosing Approach for Shunt Compensated Transmission Lines
    Ahmadi, Seyed-Alireza
    Sanaye-Pasand, Majid
    Jafarian, Peyman
    Mehrjerdi, Hasan
    IEEE TRANSACTIONS ON POWER DELIVERY, 2021, 36 (03) : 1360 - 1369
  • [4] A novel adaptive auto-reclosing scheme for transmission lines with shunt reactors
    Xie, Xing
    Huang, Chun
    ELECTRIC POWER SYSTEMS RESEARCH, 2019, 171 : 47 - 53
  • [5] A review of single phase adaptive auto-reclosing schemes for EHV transmission lines
    Waqar Ahmad Khan
    Tianshu Bi
    Ke Jia
    Protection and Control of Modern Power Systems, 2019, 4
  • [6] A review of single phase adaptive auto-reclosing schemes for EHV transmission lines
    Khan, Waqar Ahmad
    Bi, Tianshu
    Jia, Ke
    PROTECTION AND CONTROL OF MODERN POWER SYSTEMS, 2019, 4 (01)
  • [7] Adaptive three-phase auto-reclosing strategy based on capacitor voltage for power transmission lines with shunt reactors
    Huang F.
    Li F.
    Xie C.
    Wang T.
    Ma H.
    Bai H.
    Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2020, 40 (06): : 170 - 176and197
  • [8] Adaptive single-phase auto-reclosing scheme based on the moving average filter-quadrature signal generator for transmission lines with shunt reactors
    Xie, Xing
    Huang, Zebo
    Fan, Xingming
    Tang, Tao
    ELECTRIC POWER SYSTEMS RESEARCH, 2023, 223
  • [9] SINGLE-PHASE AUTO-RECLOSING ON 750-KV TRANSMISSIONS WITH SHUNT REACTORS
    BELYAKOV, NN
    BURGSDORF, VV
    RASHKES, VS
    KHOETSIAN, KV
    ELECTRICAL TECHNOLOGY, 1981, (03): : 14 - 27
  • [10] New approach to adaptive single pole auto-reclosing of power transmission lines
    Jamali, S.
    Parham, A.
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2010, 4 (01) : 115 - 122