共 50 条
- [2] A three-agent flow shop problem for minimizing the total completion time 2017 6TH IIAI INTERNATIONAL CONGRESS ON ADVANCED APPLIED INFORMATICS (IIAI-AAI), 2017, : 825 - 828
- [8] Simple heuristic to minimize total tardiness in a single machine scheduling problem The International Journal of Advanced Manufacturing Technology, 2006, 30 : 722 - 726
- [9] A Cooperative Solver for Single Machine Total Weighted Tardiness Scheduling Problem PROCEEDINGS OF 2017 FIRST INTERNATIONAL CONFERENCE ON EMBEDDED & DISTRIBUTED SYSTEMS (EDIS 2017), 2017, : 220 - 224