共 50 条
- [21] Seismic fragility analysis of irregular continuous rigid frame girder bridge COGENT ENGINEERING, 2018, 5 (01): : 1 - 18
- [22] Research and analysis on simulating the construction control of continuous rigid frame bridge Wuhan Ligong Daxue Xuebao (Jiaotong Kexue Yu Gongcheng Ban)/Journal of Wuhan University of Technology (Transportation Science and Engineering), 2007, 31 (04): : 709 - 711
- [23] BEARING DAMAGE IDENTIFICATION STUDY OF LONG-SPAN CONTINUOUS RIGID FRAME BRIDGE PROCEEDINGS OF THE TWELFTH INTERNATIONAL SYMPOSIUM ON STRUCTURAL ENGINEERING, VOLS I AND II, 2012, : 1566 - 1572
- [24] Experiment and damage evaluation on a large-scale continuous rigid frame bridge model Gongcheng Lixue/Engineering Mechanics, 2007, 24 (10): : 124 - 130
- [25] Seismic fragility of irregular continuous rigid frame bridge Xinan Jiaotong Daxue Xuebao/Journal of Southwest Jiaotong University, 2015, 50 (05): : 845 - 851
- [26] Asymmetric of Continuous Rigid Frame bridge Precamber and construction SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1228 - 1231
- [27] Research on durability of a concrete continuous rigid frame bridge 2018 2ND INTERNATIONAL WORKSHOP ON RENEWABLE ENERGY AND DEVELOPMENT (IWRED 2018), 2018, 153
- [28] Discussion on the Teaching Methods of Continuous Rigid Frame Bridge 2011 AASRI CONFERENCE ON APPLIED INFORMATION TECHNOLOGY (AASRI-AIT 2011), VOL 2, 2011, : 330 - 332
- [29] Research on Calculating Methods of Jacking Force with High Temperature Closure for Continuous Rigid-frame Bridge FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY II, PTS 1 AND 2, 2012, 503-504 : 1220 - 1224
- [30] Study on Influence of Suspension Interval Length on Construction and Closure of Main Girder of Continuous Rigid Frame Bridge 2019 5TH INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2019, 295