NEW GRAPHICAL APPROACH TO RAILWAY INFRASTRUCTURE CAPACITY ANALYSIS

被引:32
作者
Gasparik, Jozef [1 ]
Abramovic, Borna [2 ]
Halas, Martin [3 ]
机构
[1] Univ Zilina, Fac Operat & Econ Transport & Commun, Zilina 01026, Slovakia
[2] Univ Zagreb, Fac Transport & Traff Sci, Zagreb 10000, Croatia
[3] Univ Zilina, Zilina 01026, Slovakia
来源
PROMET-TRAFFIC & TRANSPORTATION | 2015年 / 27卷 / 04期
关键词
capacity estimation; train traffic diagram; occupation time; detection path; indicators;
D O I
10.7307/ptt.v27i4.1701
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
A variety of methodologies are being used across Europe for the estimation of railway infrastructure capacity. This paper introduces the basic principles of the methodologies used - analytical methodology (e.g. Slovak railways), UIC methodology, and the graphically developed methodology of the Department of Railway Transport, University of Zilina (KZD). On the basis of these new approaches, the occupation time estimation is researched. This new method is based on a graphic approach that uses operational time intervals as part of occupation time in accordance with the Slovak methodology. The new methodology concerns graphic capacity estimation and is a conceptual framework developed by the authors for easier evaluation of occupation time in train traffic diagrams.
引用
收藏
页码:283 / 290
页数:8
相关论文
共 11 条
[1]  
Abramovic B, 2012, P 20 INT S EURO ZEL
[2]  
[Anonymous], 2010, D24 ZDR
[3]  
Cicak M., 2004, PROMET TRAFFIC TRAFF, V16, P63
[4]  
Gasparik J., 2014, COMMUNICATIONS SCIEN, V16, P25
[5]   A NEW APPROACH TO ESTIMATING THE OCCUPATION TIME OF THE RAILWAY INFRASTRUCTURE [J].
Gasparik, Jozef ;
Zitricky, Vladislav .
TRANSPORT, 2010, 25 (04) :387-393
[6]  
Halas M., 2014, THESIS U ZILINA ZILI
[7]  
Hansen IngoArne., 2008, RAILWAY TIMETABLE TRAFFIC, Analysis, Modeling, Simulation, V1
[8]  
Kendra M, 2013, P BULTRANS 2013 2013
[9]  
Kendra M, 2012, HORIZONS RAILWAY TRA, V3, P52
[10]  
Stopka O., 2014, COMMUNICATIONS, P14