Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation

被引:84
|
作者
Qiao, Yan [1 ]
Wu, NaiQi [1 ]
Zhou, MengChu [2 ,3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Tongji Univ, Minist Educ, Key Lab Embedded Syst & Serv Comp, Shanghai 200092, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
基金
中国国家自然科学基金;
关键词
Cluster tools; discrete event system; Petri net (PN); scheduling; semiconductor manufacturing; STEADY-STATE THROUGHPUT; PETRI NETS; MANUFACTURING SYSTEMS; MULTICLUSTER TOOLS; EVENT GRAPH; SCHEDULABILITY; PERFORMANCE; OPERATION; DEADLOCK; DESIGN;
D O I
10.1109/TASE.2012.2192476
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is very challenging to schedule cluster tools subject to wafer residency time constraints and activity time variation. This work develops a Petri net model to describe the system and proposes a two-level real-time scheduling architecture. At the lower level, a real-time control policy is used to offset the activity time variation as much as possible. At the upper level, a periodical off-line schedule is derived under the normal condition. This work presents the schedulability conditions and scheduling algorithms for an off-line schedule. The schedulability conditions can be analytically checked. If they are satisfied, an off-line schedule can be analytically found. The off-line schedule together with a real-time control policy forms the real-time schedule for the system. It is optimal in terms of cycle time minimization. Illustrative examples are given to show the application of the proposed approach.
引用
收藏
页码:564 / 577
页数:14
相关论文
共 50 条
  • [41] Scheduling of Time-Constrained Single-Arm Cluster Tools with Two-Space Process Modules in Semiconductor Manufacturing
    Zou, ChengYu
    Wang, GengHong
    Gu, Lei
    Li, Jie
    Wu, NaiQi
    Qiao, Yan
    IEEE ROBOTICS AND AUTOMATION LETTERS, 2024, 9 (07): : 6352 - 6359
  • [42] Scheduling Cluster Tools With Ready Time Constraints for Consecutive Small Lots
    Kim, Hyun-Jung
    Lee, Jun-Ho
    Jung, Chihyun
    Lee, Tae-Eog
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2013, 10 (01) : 145 - 159
  • [43] Petri Net-Based Scheduling Analysis of Dual-Arm Cluster Tools Subject to Wafer Revisiting and Residency Time Constraints
    Qiao, Yan
    Wu, NaiQi
    Zhou, MengChu
    Dai, QingYun
    2013 10TH IEEE INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2013, : 252 - 257
  • [44] Scheduling of time-constrained single-arm cluster tools with purge operations in wafer fabrications
    Yuan, Fenglian
    Zhao, Qingling
    Huang, Bo
    Pan, Chunrong
    JOURNAL OF SYSTEMS ARCHITECTURE, 2023, 134
  • [45] Efficient Approach to Scheduling of Transient Processes for Time-Constrained Single-Arm Cluster Tools With Parallel Chambers
    Yang, FaJun
    Qiao, Yan
    Gao, KaiZhou
    Wu, NaiQi
    Zhu, YuTing
    Simon, Ian Ware
    Su, Rong
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2020, 50 (10): : 3646 - 3657
  • [46] Petri Net-based Response Policies to Process Module Failure in Time-constrained Single-arm Cluster Tools
    Qiao, Yan
    Wu, NaiQi
    Pan, ChunRong
    Zhou, MengChu
    2014 IEEE 11TH INTERNATIONAL CONFERENCE ON NETWORKING, SENSING AND CONTROL (ICNSC), 2014, : 144 - 149
  • [47] Scheduling of Single-Arm Multi-Cluster Tools to Achieve the Minimum Cycle Time
    Zhu, QingHua
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    2013 IEEE INTERNATIONAL CONFERENCE ON ROBOTICS AND AUTOMATION (ICRA), 2013, : 3555 - 3560
  • [48] Schedulability and scheduling of dual-arm cluster tools with residency time constraints based on Petri net
    Wu, Naiqi
    Zhou, MengChu
    2006 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING, VOLS 1 AND 2, 2006, : 87 - +
  • [49] Petri Net-Based Optimal One-Wafer Scheduling of Single-Arm Multi-Cluster Tools in Semiconductor Manufacturing
    Zhu, QingHua
    Wu, NaiQi
    Qiao, Yan
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2013, 26 (04) : 578 - 591
  • [50] Petri Net Modeling and Scheduling of a Close-Down Process for Time-Constrained Single-Arm Cluster Tools
    Zhu, QingHua
    Zhou, MengChu
    Qiao, Yan
    Wu, Naiqi
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2018, 48 (03): : 389 - 400