Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation

被引:84
|
作者
Qiao, Yan [1 ]
Wu, NaiQi [1 ]
Zhou, MengChu [2 ,3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Tongji Univ, Minist Educ, Key Lab Embedded Syst & Serv Comp, Shanghai 200092, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
基金
中国国家自然科学基金;
关键词
Cluster tools; discrete event system; Petri net (PN); scheduling; semiconductor manufacturing; STEADY-STATE THROUGHPUT; PETRI NETS; MANUFACTURING SYSTEMS; MULTICLUSTER TOOLS; EVENT GRAPH; SCHEDULABILITY; PERFORMANCE; OPERATION; DEADLOCK; DESIGN;
D O I
10.1109/TASE.2012.2192476
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is very challenging to schedule cluster tools subject to wafer residency time constraints and activity time variation. This work develops a Petri net model to describe the system and proposes a two-level real-time scheduling architecture. At the lower level, a real-time control policy is used to offset the activity time variation as much as possible. At the upper level, a periodical off-line schedule is derived under the normal condition. This work presents the schedulability conditions and scheduling algorithms for an off-line schedule. The schedulability conditions can be analytically checked. If they are satisfied, an off-line schedule can be analytically found. The off-line schedule together with a real-time control policy forms the real-time schedule for the system. It is optimal in terms of cycle time minimization. Illustrative examples are given to show the application of the proposed approach.
引用
收藏
页码:564 / 577
页数:14
相关论文
共 50 条
  • [21] A Petri net method for schedulability and scheduling problems in single-arm cluster tools with wafer residency time constraints
    Wu, Naiqi
    Chu, Chengbin
    Chu, Feng
    Zhou, Meng Chu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2008, 21 (02) : 224 - 237
  • [22] How to Respond to Process Module Failure in Residency Time-Constrained Single-Arm Cluster Tools
    Qiao, Yan
    Wu, Naiqi
    Pan, ChunRong
    Zhou, MengChu
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2014, 27 (04) : 462 - 474
  • [23] Schedulability and Scheduling Analysis of Dual-Arm Cluster Tools with Wafer Revisiting and Residency Time Constraints Based on a Novel Schedule
    Qiao, Yan
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON SYSTEMS MAN CYBERNETICS-SYSTEMS, 2015, 45 (03): : 472 - 484
  • [24] Schedulability Analysis and Optimal Scheduling of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation
    Wu, NaiQi
    Zhou, MengChu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (01) : 203 - 209
  • [25] Robot Waiting Time Analysis and Its Impact on Wafer Delay Time of Single-Arm Cluster Tools
    Xiong, WenQing
    Qiao, Yan
    Wu, NaiQi
    Bai, LiPing
    Chen, MingXin
    Hsieh, PinHui
    Yin, Li
    IFAC PAPERSONLINE, 2020, 53 (04): : 384 - 389
  • [26] Wafer Residency Time Analysis for Time-Constrained Single-Robot-Arm Cluster Tools With Activity Time Variation
    Yang, Fajun
    Tang, Xin
    Wu, Naiqi
    Zhang, Chunjiang
    Gao, Liang
    IEEE TRANSACTIONS ON CONTROL SYSTEMS TECHNOLOGY, 2020, 28 (04) : 1177 - 1188
  • [27] Scheduling dual-arm cluster tools with multiple wafer types and residency time constraints
    Wang, Jipeng
    Hu, Hesuan
    Pan, Chunrong
    Zhou, Yuan
    Li, Liang
    IEEE-CAA JOURNAL OF AUTOMATICA SINICA, 2020, 7 (03) : 776 - 789
  • [28] Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model
    Gu, Lei
    Wu, Naiqi
    Li, Tan
    Zhang, Siwei
    Wu, Wenyu
    MATHEMATICS, 2024, 12 (18)
  • [29] Modeling, Analysis and Control of Dual-Arm Cluster Tools With Residency Time Constraint and Activity Time Variation Based on Petri Nets
    Wu, Nai Qi
    Zhou, MengChu
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2012, 9 (02) : 446 - 454
  • [30] Efficient Approach to Cyclic Scheduling of Single-Arm Cluster Tools With Chamber Cleaning Operations and Wafer Residency Time Constraint
    Yang, Fajun
    Wu, Naiqi
    Gao, Kaizhou
    Zhang, Chunjiang
    Zhu, Yuting
    Su, Rong
    Qiao, Yan
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2018, 31 (02) : 196 - 205