Real-Time Scheduling of Single-Arm Cluster Tools Subject to Residency Time Constraints and Bounded Activity Time Variation

被引:83
作者
Qiao, Yan [1 ]
Wu, NaiQi [1 ]
Zhou, MengChu [2 ,3 ]
机构
[1] Guangdong Univ Technol, Sch Electromech Engn, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
[2] Tongji Univ, Minist Educ, Key Lab Embedded Syst & Serv Comp, Shanghai 200092, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
基金
中国国家自然科学基金;
关键词
Cluster tools; discrete event system; Petri net (PN); scheduling; semiconductor manufacturing; STEADY-STATE THROUGHPUT; PETRI NETS; MANUFACTURING SYSTEMS; MULTICLUSTER TOOLS; EVENT GRAPH; SCHEDULABILITY; PERFORMANCE; OPERATION; DEADLOCK; DESIGN;
D O I
10.1109/TASE.2012.2192476
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
It is very challenging to schedule cluster tools subject to wafer residency time constraints and activity time variation. This work develops a Petri net model to describe the system and proposes a two-level real-time scheduling architecture. At the lower level, a real-time control policy is used to offset the activity time variation as much as possible. At the upper level, a periodical off-line schedule is derived under the normal condition. This work presents the schedulability conditions and scheduling algorithms for an off-line schedule. The schedulability conditions can be analytically checked. If they are satisfied, an off-line schedule can be analytically found. The off-line schedule together with a real-time control policy forms the real-time schedule for the system. It is optimal in terms of cycle time minimization. Illustrative examples are given to show the application of the proposed approach.
引用
收藏
页码:564 / 577
页数:14
相关论文
共 49 条
[1]   Identical part production in cyclic robotic cells: Concepts, overview and open questions [J].
Brauner, Nadia .
DISCRETE APPLIED MATHEMATICS, 2008, 156 (13) :2480-2492
[2]   Optimal Scheduling of Multicluster Tools With Constant Robot Moving Times, Part I: Two-Cluster Analysis [J].
Chan, Wai Kin Victor ;
Yi, Jingang ;
Ding, Shengwei .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2011, 8 (01) :5-16
[3]   On throughput maximization in constant travel-time robotic cells [J].
Dawande, Milind ;
Sriskandarajah, Chelliah ;
Sethi, Suresh .
Manufacturing and Service Operations Management, 2002, 4 (04) :296-312
[4]   Multicluster tools scheduling: An integrated event graph and network model approach [J].
Ding, Shengwei ;
Yi, Jingang ;
Zhang, Mike Tao .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2006, 19 (03) :339-351
[5]   Liveness and Ratio-Enforcing Supervision of Automated Manufacturing Systems Using Petri Nets [J].
Hu, HeSuan ;
Zhou, MengChu ;
Li, ZhiWu .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2012, 42 (02) :392-403
[6]   Computationally Improved Optimal Deadlock Control Policy for Flexible Manufacturing Systems [J].
Huang, Yi-Sheng ;
Pan, Yen-Liang ;
Zhou, MengChu .
IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART A-SYSTEMS AND HUMANS, 2012, 42 (02) :404-415
[7]  
JEVTIC D, 1999, Patent No. 5928389
[8]   Schedulability analysis of time-constrained cluster tools with bounded time variation by an extended Petri net [J].
Kim, Ja-Hee ;
Lee, Tae-Eog .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2008, 5 (03) :490-503
[9]   Scheduling analysis of time-constrained dual-armed cluster tools [J].
Kim, JH ;
Lee, TE ;
Lee, HY ;
Park, DB .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2003, 16 (03) :521-534
[10]   A Petri-Net approach to modular supervision with conflict resolution for semiconductor manufacturing systems [J].
Lee, Jin Shyan ;
Zhou, MengChu ;
Hsu, Pau Lo .
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2007, 4 (04) :584-588