A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem

被引:4
作者
Deng Lin-yi [1 ,2 ]
Wang Yun-long [2 ]
Lin Yan [2 ]
机构
[1] Dalian Univ Technol, Dept Comp, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Ship CAD Engn Ctr, Dalian 116024, Peoples R China
来源
2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11 | 2008年
关键词
Particle swarm optimization; Project scheduling; Resource-constrained; Priority rule;
D O I
10.1109/CCDC.2008.4597470
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider the resource-constrained multi-project scheduling problem (RCMPSP) and makespan minimization as objective. We present a new particle swarm optimization (PSO) approach to solve this problem. The particle representation is based on priority rules. The potential solution to the RCMPSP is, i.e., a sequence of priority rules deciding the order of scheduling the non-dummy activities, is represented by the multidimensional particle position. Hence PSO is applied to search the optimal schedule for the RCMPSP, in which a serial schedule generate scheme is adopted to transform the particle-represented priority rule to a schedule. Computational analyses are represented to verify the effective of the proposed methodology.
引用
收藏
页码:1038 / +
页数:2
相关论文
共 14 条
[11]   MULTI-PROJECT SCHEDULING - CATEGORIZATION OF HEURISTIC RULES PERFORMANCE [J].
KURTULUS, I ;
DAVIS, EW .
MANAGEMENT SCIENCE, 1982, 28 (02) :161-172
[12]   Scheduling to minimize product design time using a genetic algorithm [J].
Lam, FSC ;
Lin, BC ;
Sriskandarajah, C ;
Yan, H .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1999, 37 (06) :1369-1386
[13]   The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure [J].
Pongcharoen, P ;
Hicks, C ;
Braiden, PM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 152 (01) :215-225
[14]  
ZHUANG M, 2004, AM SOC MECH ENG DES, P1