A Particle Swarm Optimization Based on Priority Rule for Resource-Constrained Multi-Project Scheduling Problem

被引:4
作者
Deng Lin-yi [1 ,2 ]
Wang Yun-long [2 ]
Lin Yan [2 ]
机构
[1] Dalian Univ Technol, Dept Comp, Dalian 116024, Peoples R China
[2] Dalian Univ Technol, Ship CAD Engn Ctr, Dalian 116024, Peoples R China
来源
2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11 | 2008年
关键词
Particle swarm optimization; Project scheduling; Resource-constrained; Priority rule;
D O I
10.1109/CCDC.2008.4597470
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider the resource-constrained multi-project scheduling problem (RCMPSP) and makespan minimization as objective. We present a new particle swarm optimization (PSO) approach to solve this problem. The particle representation is based on priority rules. The potential solution to the RCMPSP is, i.e., a sequence of priority rules deciding the order of scheduling the non-dummy activities, is represented by the multidimensional particle position. Hence PSO is applied to search the optimal schedule for the RCMPSP, in which a serial schedule generate scheme is adopted to transform the particle-represented priority rule to a schedule. Computational analyses are represented to verify the effective of the proposed methodology.
引用
收藏
页码:1038 / +
页数:2
相关论文
共 14 条
[1]   An efficient optimal solution procedure for the preemptive resource-constrained project scheduling problem [J].
Demeulemeester, EL ;
Herroelen, WS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 90 (02) :334-348
[2]  
Eberhart R., 1995, MHS 95 P 6 INT S MIC, DOI DOI 10.1109/MHS.1995.494215
[3]  
Garey MR, 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[4]  
GOLDBERG DE, 1989, GENETIC ALGORITHM SE
[5]   Multi-product planning and scheduling using genetic algorithm approach [J].
Ip, WH ;
Li, Y ;
Man, KF ;
Tang, KS .
COMPUTERS & INDUSTRIAL ENGINEERING, 2000, 38 (02) :283-296
[6]  
Kennedy J, 1995, 1995 IEEE INTERNATIONAL CONFERENCE ON NEURAL NETWORKS PROCEEDINGS, VOLS 1-6, P1942, DOI 10.1109/icnn.1995.488968
[7]  
Kolisch R, 1996, EUR J OPER RES, V90, P320, DOI [10.1016/0377-2217(95)00357-6, 10.1016/S0377-2217(96)00170-1]
[8]  
KOLISCH R, 1997, 463 U KIEL
[9]  
Kolisch R., 1999, Project scheduling: Recent models, algorithms and applications, P147, DOI [DOI 10.1007/978-1-4615-5533-97, 10.1007/978-1-4615-5533-9_7, DOI 10.1007/978-1-4615-5533-9_7]
[10]  
Kolish R., 1998, HDB RECENT ADV PROJE, P197