共 28 条
- [1] Ameh OJ, 2010, J CONSTR DEV CTRIES, V15, P49
- [3] Causes of delay in large construction projects [J]. Int. J. Proj. Manage., 2006, 4 (349-357): : 349 - 357
- [4] Atkinson A.R., 2002, ENG CONSTR ARCHIT MA, V9, P53, DOI DOI 10.1108/EB021206
- [5] beom lee sang, 2010, [Journal of the Architectural Institute of Korea Structure & Construction, 대한건축학회논문집 구조계], V26, P79
- [7] Cheng R., 2016, Motivation and means: How and why IPD and lean lead to success
- [8] Cho S, 2002, THESIS HONGIK U GRAD