A solution approach based on Benders decomposition for the preventive maintenance scheduling problem of a stochastic large-scale energy system

被引:15
作者
Lusby, Richard [1 ]
Muller, Laurent Flindt [1 ]
Petersen, Bjorn [1 ]
机构
[1] Tech Univ Denmark, Dept Engn Management, DK-2800 Lyngby, Denmark
关键词
OPTIMIZATION; GENERATION;
D O I
10.1007/s10951-012-0310-0
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper describes a Benders decomposition-based framework for solving the large scale energy management problem that was posed for the ROADEF 2010 challenge. The problem was taken from the power industry and entailed scheduling the outage dates for a set of nuclear power plants, which need to be regularly taken down for refueling and maintenance, in such a way that the expected cost of meeting the power demand in a number of potential scenarios is minimized. We show that the problem structure naturally lends itself to Benders decomposition; however, not all constraints can be included in the mixed integer programming model. We present a two phase approach that first uses Benders decomposition to solve the linear programming relaxation of a relaxed version of the problem. In the second phase, integer solutions are enumerated and a procedure is applied to make them satisfy constraints not included in the relaxed problem. To cope with the size of the formulations arising in our approach we describe efficient preprocessing techniques to reduce the problem size and show how aggregation can be applied to each of the subproblems. Computational results on the test instances show that the procedure competes well on small instances of the problem, but runs into difficulty on larger ones. Unlike heuristic approaches, however, this methodology can be used to provide lower bounds on solution quality.
引用
收藏
页码:605 / 628
页数:24
相关论文
共 34 条
[1]  
ALMAKHLAFI A, 2012, WORLD C COMP INT JUN, P10
[2]  
BENDERS JF, 1962, NUMER MATH, V4, P238, DOI [DOI 10.1007/BF01386316, DOI 10.1007/S10287-004-0020-Y]
[3]   Modeling Risk Management in Oligopolistic Electricity Markets: A Benders Decomposition Approach [J].
Cabero, Jordi ;
Ventosa, Mariano J. ;
Cerisola, Santiago ;
Baillo, Alvaro .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2010, 25 (01) :263-271
[4]  
CONTRERAS I, 2010, CIRRELT201026 INT RE
[5]   Generation maintenance scheduling considering transmission constraints [J].
da Silva, EL ;
Schilling, MT ;
Rafael, MC .
IEEE TRANSACTIONS ON POWER SYSTEMS, 2000, 15 (02) :838-843
[6]   Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches [J].
Dahal, Keshav P. ;
Chakpitak, Nopasit .
ELECTRIC POWER SYSTEMS RESEARCH, 2007, 77 (07) :771-779
[7]  
DARLAY J, 2010, EURO 24 LISBON 24 EU, P280
[8]   OPTIMAL GENERATOR MAINTENANCE SCHEDULING USING INTEGER PROGRAMMING [J].
DOPAZO, JF ;
MERRILL, HM .
IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1975, 94 (05) :1537-1545
[9]   On the application of stochastic models in nuclear power plant maintenance [J].
Doyle, EK .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 154 (03) :673-690
[10]   A Tabu search algorithm for maintenance scheduling of generating units [J].
El-Amin, I ;
Duffuaa, S ;
Abbas, M .
ELECTRIC POWER SYSTEMS RESEARCH, 2000, 54 (02) :91-99