Taxonomy of risks in PPP transportation projects: a systematic literature review

被引:0
作者
Phuong Thi Le [1 ,2 ]
Kirytopoulos, Konstantinos [1 ,3 ]
Chileshe, Nicholas [1 ]
Rameezdeen, Raufdeen [1 ]
机构
[1] Univ South Australia, Sch Nat & Built Environm, Adelaide, SA, Australia
[2] Univ Danang, Univ Technol & Educ, Dept Civil Engn, Danang, Vietnam
[3] Natl Tech Univ Athens, Sch Mech Engn, Athens, Greece
关键词
Public Private Partnership (PPP); risks; taxonomy; systematic literature review; transportation; PUBLIC-PRIVATE PARTNERSHIP; CRITICAL SUCCESS FACTORS; INFRASTRUCTURE PROJECTS; CONCESSION PERIOD; HIGHWAY PROJECTS; ROAD PROJECTS; MANAGEMENT; MITIGATION; ALLOCATION; MODEL;
D O I
10.1080/15623599.2019.1615756
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Despite the existence of previous studies on risks in Public Private Partnership transportation projects, there is still absence of an overall risk catalogue, common terminology and consistent risk structure. This research provides comprehensive risk inventory, harmonious language and taxonomy for risk classification. A systematic literature review was conducted that resulted in 72 recent articles. The Concept-driven and the Grounded theory approaches were combined for the qualitative data analysis. As a result, 86 unique risks were identified and grouped according to the phase of the project life cycle they are likely to occur. As obtained from the analysis, the most frequent risks in literature are 'low traffic demand', 'escalation of operation-maintenance cost', 'inflation rate fluctuation', 'problems with land acquisition and compensation', 'change in laws and regulations' and 'interest rate fluctuation'. The proposed terminology and taxonomy appear to be appropriate and provide an overall understanding of risk identification and classification as well as improve the effectiveness of communications for both PPP practitioners and academics in this area.
引用
收藏
页码:166 / 181
页数:16
相关论文
共 78 条
[1]  
Al-Bahar J., 1991, Journal of Construction Engineering and Management, V116, P533, DOI DOI 10.1061/(ASCE)0733-9364(1990)116:3(533
[2]   Role of Financial Risks in BOT Megatransportation Projects in Developing Countries [J].
Aladag, Hande ;
Isik, Zeynep .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (04)
[3]   Dynamic demand risk assessment for toll road projects [J].
Alasad, Rajaa ;
Motawa, Ibrahim .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2015, 33 (10) :799-817
[4]   Risk Mitigation and Sharing in Motorway PPPs: A Comparative Policy Analysis of Alternative Approaches [J].
Albalate, Daniel ;
Bel, Germa ;
Bel-Pinana, Paula ;
Geddes, Richard R. .
JOURNAL OF COMPARATIVE POLICY ANALYSIS, 2015, 17 (05) :481-501
[5]  
[Anonymous], CONSTR MANAG EC
[6]  
[Anonymous], J FACILITY MANAGE
[7]  
[Anonymous], INT INTERDISCIP J ED
[8]  
[Anonymous], 2018, PRIVATE PARTICIPATIO
[9]  
[Anonymous], 2014, P 30 ANN ARCOM C
[10]  
[Anonymous], PROJ MAN BOD KNOWL R