Applying constraint satisfaction techniques to job shop scheduling

被引:33
作者
Cheng, CC
Smith, SF
机构
[1] CARNEGIE MELLON UNIV,GRAD SCH IND ADM,PITTSBURGH,PA 15213
[2] CARNEGIE MELLON UNIV,INST ROBOT,PITTSBURGH,PA 15213
关键词
D O I
10.1023/A:1018934507395
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, we investigate the applicability of a constraint satisfaction problem solving (CSP) model, recently developed for deadline scheduling, to more commonly studied problems of schedule optimization. Our hypothesis is twofold: (1) that CSP scheduling techniques provide a basis for developing high-performance approximate solution procedures in optimization contexts, and (2) that the representational assumptions underlying CSP models allow these procedures to naturally accommodate the idiosyncratic constraints that complicate most real-world applications. We focus specifically on the objective criterion of makespan minimization, which has received the most attention within the job shop scheduling literature. We define an extended solution procedure somewhat unconventionally by reformulating the makespan problem as one of solving a series of different but related deadline scheduling problems, and embedding a simple CSP procedure as the subproblem solver. We first present the results of an empirical evaluation of our procedure performed on a range of previously studied benchmark problems. Our procedure is found to provide strong cost/performance, producing solutions competitive with those obtained using recently reported shifting bottleneck search procedures at reduced computational expense. To demonstrate generality, we also consider application of our procedure to a more complicated, multi-product hoist scheduling problem. With only minor adjustments, our procedure is found to significantly outperform previously published procedures for solving this problem across a range of input assumptions.
引用
收藏
页码:327 / 357
页数:31
相关论文
共 42 条
[1]  
AARTS RJ, 1994, P 1994 EUR C ART INT
[2]   THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING [J].
ADAMS, J ;
BALAS, E ;
ZAWACK, D .
MANAGEMENT SCIENCE, 1988, 34 (03) :391-401
[3]   MAINTAINING KNOWLEDGE ABOUT TEMPORAL INTERVALS [J].
ALLEN, JF .
COMMUNICATIONS OF THE ACM, 1983, 26 (11) :832-843
[4]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[5]  
Applegate D., 1991, ORSA Journal on Computing, V3, P149, DOI 10.1287/ijoc.3.2.149
[6]  
ARMSTRONG R, 1994, EUROPEAN J OPERATION, V78, P13
[8]  
BALAS E, 1993, MSRR589R CARN MELL U
[9]   MAINTAINING PROJECT NETWORKS IN AUTOMATED ARTIFICIAL-INTELLIGENCE PLANNING [J].
BELL, CE .
MANAGEMENT SCIENCE, 1989, 35 (10) :1192-1214
[10]  
BODDY MS, 1994, P 3 INT S ART INT RO