Improving Contract Administration: Information System Approach on Legal Information

被引:0
作者
Chong, Heap Yih [1 ]
机构
[1] Univ Tunku Abdul Rahman, Fac Sci & Engn, Setapak 53300, Malaysia
来源
INFORMATION-AN INTERNATIONAL INTERDISCIPLINARY JOURNAL | 2012年 / 15卷 / 11B期
关键词
Information system; Contract administration; Legal information; Construction; DECISION-SUPPORT-SYSTEM; DATA WAREHOUSE; CONSTRUCTION; MANAGEMENT;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
An effective contract administration requires proper use of the legal information. However, the information is unstructured and poorly drafted, which caused poor understanding and it may lead to a dispute. Therefore, the paper aims to identify means of enhancing the understanding and appreciation of legal information from the contract documents; and, to develop a template of database system that incorporated the proposed means for improving the practice of contract administration. The template received positive feedback. It is concluded the information system approach on legal information is novel in terms of the proper extraction and use of the information for contract administration.
引用
收藏
页码:4891 / 4900
页数:10
相关论文
共 29 条
[1]   Augmented process model for e-tendering: Towards integrating object models with document management systems [J].
Ajam, Maher ;
Alshawi, Mustafa ;
Mezher, Toufic .
AUTOMATION IN CONSTRUCTION, 2010, 19 (06) :762-778
[2]  
Broome J.C., 1997, INT J PROJ MANAG, V15, P255, DOI DOI 10.1016/S0263-7863(96)00078-6
[3]   Developing legal writing materials for English second language learners: problems and perspectives [J].
Candlin, CN ;
Bhatia, VK ;
Jensen, CH .
ENGLISH FOR SPECIFIC PURPOSES, 2002, 21 (04) :299-320
[4]   Application of data warehouse and Decision Support System in construction management [J].
Chau, KW ;
Cao, Y ;
Anson, M ;
Zhang, JP .
AUTOMATION IN CONSTRUCTION, 2003, 12 (02) :213-224
[5]   Fuzzy case-based reasoning for coping with construction disputes [J].
Cheng, Min-Yuan ;
Tsai, Hsing-Chih ;
Chiu, Yi-Hsiang .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (02) :4106-4113
[6]   A study of construction mediator tactics - Part I: Taxonomies of dispute sources, mediator tactics and mediation outcomes [J].
Cheung, Sai On ;
Yiu, Kenneth T. W. .
BUILDING AND ENVIRONMENT, 2007, 42 (02) :752-761
[7]  
Chong HY, 2011, INFORMATION-TOKYO, V14, P3199
[8]   A case study into the language structure of construction standard form in Malaysia [J].
Chong, Heap-Yih ;
Zin, Rosli Mohamad .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2010, 28 (06) :601-608
[9]  
Cingil I, 2012, INFORMATION-TOKYO, V15, P537
[10]  
Cutts M., 2004, Oxford Guide to Plain English, Vsecond