Implementing a parametric maximum flow algorithm for optimal open pit mine design under uncertain supply and demand

被引:47
作者
Asad, M. W. A. [1 ]
Dimitrakopoulos, R. [1 ]
机构
[1] McGill Univ, COSMO Stochast Mine Planning Lab, Montreal, PQ, Canada
基金
加拿大自然科学与工程研究理事会; 欧洲研究理事会;
关键词
open pit mine optimization; maximum flow algorithm; Lagrangian relaxation; subgradient method; CUTOFF GRADE POLICY; CLOSURE; GRAPH; OPTIMIZATION; PSEUDOFLOW; OLD;
D O I
10.1057/jors.2012.26
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Conventional open pit mine optimization models for designing mining phases and ultimate pit limit do not consider expected variations and uncertainty in metal content available in a mineral deposit (supply) and commodity prices (market demand). Unlike the conventional approach, a stochastic framework relies on multiple realizations of the input data so as to account for uncertainty in metal content and financial parameters, reflecting potential supply and demand. This paper presents a new method that jointly considers uncertainty in metal content and commodity prices, and incorporates time-dependent discounted values of mining blocks when designing optimal production phases and ultimate pit limit, while honouring production capacity constraints. The structure of a graph representing the stochastic framework is proposed, and it is solved with a parametric maximum flow algorithm. Lagragnian relaxation and the subgradient method are integrated in the proposed approach to facilitate producing practical designs. An application at a copper deposit in Canada demonstrates the practical aspects of the approach and quality of solutions over conventional methods, as well as the effectiveness of the proposed stochastic approach in solving mine planning and design problems. Journal of the Operational Research Society (2013) 64, 185-197. doi:10.1057/jors.2012.26 Published online 25 April 2012
引用
收藏
页码:185 / 197
页数:13
相关论文
共 41 条
  • [11] Coleou T, 1989, P 21 INT APCOM S, P485
  • [12] Denby B., 1998, Proceedings of the 27th Symposium on Application of Computers and Operations Research in the Mineral Industry, P605
  • [13] Dimitrakopoulos R, 2011, J MIN SCI+, V47, P138, DOI 10.1134/S1062739147020018
  • [14] Evaluating mine plans under uncertainty: Can the real options make a difference?
    Dimitrakopoulos, Roussos G.
    Sabour, Sabry A. Abdel
    [J]. RESOURCES POLICY, 2007, 32 (03) : 116 - 125
  • [15] DOWD PA, 1994, T I MIN METALL A, V103, pA148
  • [16] A NEW ALGORITHM FOR COMPUTING THE MAXIMAL CLOSURE OF A GRAPH
    FAALAND, B
    KIM, K
    SCHMITT, T
    [J]. MANAGEMENT SCIENCE, 1990, 36 (03) : 315 - 331
  • [17] Francois-Bongarcon D., 1984, Transactions of Society of Mining Engineers of AIME, V274, P1801
  • [18] A FAST PARAMETRIC MAXIMUM FLOW ALGORITHM AND APPLICATIONS
    GALLO, G
    GRIGORIADIS, MD
    TARJAN, RE
    [J]. SIAM JOURNAL ON COMPUTING, 1989, 18 (01) : 30 - 55
  • [19] A risk quantification framework for strategic mine planning: Method and application
    Godoy M.
    Dimitrakopoulos R.
    [J]. Journal of Mining Science, 2011, 47 (2) : 235 - 246
  • [20] A NEW APPROACH TO THE MAXIMUM-FLOW PROBLEM
    GOLDBERG, AV
    TARJAN, RE
    [J]. JOURNAL OF THE ACM, 1988, 35 (04) : 921 - 940