Identification of Risk Management System in Construction Industry in Pakistan

被引:88
作者
Choudhry, Rafiq M. [1 ,2 ]
Iqbal, Khurram
机构
[1] King Faisal Univ, Dept Civil & Environm Engn, Coll Engn, Al Hufuf, Al Ahsa, Saudi Arabia
[2] Natl Univ Sci & Technol, Dept Construct Engn & Management, Sch Civil & Environm Engn, Islamabad 44000, Pakistan
关键词
Construction industry; Construction site; Risk management; Risk management techniques; Joint risk management; Stakeholder; Pakistan; TRENDS;
D O I
10.1061/(ASCE)ME.1943-5479.0000122
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Risk management is a relatively new field in the construction industry of Pakistan, but it is gradually gaining prominence because of increased construction activity and competitiveness. This is an empirical survey-based study of risk management in the construction industry of Pakistan. It reports the findings of the importance of risks, their current management techniques, the existing status of risk management systems of the organizations, and barriers to effective risk management from the perspective of key stakeholders. The analysis of the results reveals that financial and economic factors, followed by quality, are the most important risks, and the industry generally tries to avoid or transfer these risks. Results indicated that the risk management system and practices of most of the organizations are reactive, semipermanent, informal, and unstructured with nonexistent and limited committed resources to deal with risks. Nonetheless, the results of interviews indicate that there is awareness about risk management and a desire to learn from past mistakes. The study concludes that the major barriers to effective risk management are the lack of a formal risk management system and the lack of a mechanism for joint risk management by the parties. Insights and discussions are given in the analysis, which are valuable to planners, project managers, supervisors, and other stakeholders. Finally, this work can be used in exploring mechanisms for joint risk management by prospective stakeholders. DOI: 10.1061/(ASCE)ME.1943-5479.0000122. (C) 2013 American Society of Civil Engineers.
引用
收藏
页码:42 / 49
页数:8
相关论文
共 24 条
[1]  
[Anonymous], 4360 ASNZS
[2]  
[Anonymous], 2004, GUID PROJ MAN BOD KN, V3rd
[3]  
Baldry D., 1998, International journal of Project Management, V16, P35
[4]  
Berends T. C., 2000, International Journal of Project Management, V18, P165, DOI 10.1016/S0263-7863(99)00076-9
[5]  
Burki A. A., 2010, ANAL REPORT IND POLI, VI
[6]  
Chapman C.B., 1997, INT J PROJ MANAG, V15, P273, DOI [DOI 10.1016/S0263-7863(96)00079-8, 10.1016/S0263-7863(96)00079-8]
[7]  
Federal Bureau of Statistics (FBS), 2010, PAK STAT YB 2010
[8]  
Flanagan R., 1999, Risk Management and Construction
[9]  
Jaafari A., 2001, International Journal of Project Management, V19, P89, DOI [https://doi.org/10.1016/S0263-7863(99)00047-2, DOI 10.1016/S0263-7863(99)00047-2]
[10]   RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION [J].
KANGARI, R .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04) :422-429