A GENERATIVE COMPUTER AIDED PROCESS PLANNING (CAPP) METHODOLOGY USING GAP ANALYSIS

被引:0
|
作者
Shoval, Shraga [1 ]
机构
[1] Ariel Univ Ctr, Dept Ind Engn & Management, Ariel, Israel
来源
2011 INTERNATIONAL CONFERENCE ON INSTRUMENTATION, MEASUREMENT, CIRCUITS AND SYSTEMS (ICIMCS 2011), VOL 3: COMPUTER-AIDED DESIGN, MANUFACTURING AND MANAGEMENT | 2011年
关键词
Compute Aided Process Planning; Gap Analysis; Optimal Resources Allocation;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Computer Aided Process Planning (CAPP) is a method for determining the assignment of resources to production processes, and the sequence of the manufacturing operations needed to produce a given part or product. In this paper we present a generic computer aided process planning methodology that provides an estimate to various production routings and resource allocations. The methodology, is based on a gap analysis between the resources capabilities and the production requirements. The method scans through alternative routings and resource allocations, and determines the optimal route for each product.
引用
收藏
页码:125 / 132
页数:8
相关论文
共 3 条
  • [1] Transition Assessment: Using Gap Analysis to Enhance Effective Transition Planning
    Lowenthal, Alison B.
    Bassett, Diane S.
    INTERVENTION IN SCHOOL AND CLINIC, 2012, 48 (01) : 30 - 37
  • [2] ISMS Planning Based On ISO/IEC 27001:2013 Using Analytical Hierarchy Process at Gap Analysis Phase (Case Study : XYZ Institute)
    Briliyant, Obrina Candra
    Candra, Johanes Widhi
    Tamba, Sion Rebeca
    2017 11TH INTERNATIONAL CONFERENCE ON TELECOMMUNICATION SYSTEMS SERVICES AND APPLICATIONS (TSSA), 2017,
  • [3] Using Modified Nadler-Tushman Model in GAP Analysis of Educational Process of EFMNS Certified Engineer
    Filipovic, Srdan
    Vasic, Milos
    Tica, Slaven
    Veg, Emil
    Sinikovic, Goran
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2020, 27 (04): : 1213 - 1220