Thermodynamic analysis of a pyroprocessing unit of a cement plant: a case study

被引:15
作者
Atmaca, Adem [1 ]
Kanoglu, Mehmet [1 ]
Gadalla, Mohamed [2 ]
机构
[1] Gaziantep Univ, Dept Mech Engn, TR-27310 Gaziantep, Turkey
[2] Amer Univ Sharjah, Dept Mech Engn, Sharjah, U Arab Emirates
关键词
cement; clinker; energy; exergy; efficiency; pyroprocessing unit; emissions; insulation; EXERGY ANALYSES; ENERGY USE; EFFICIENCY;
D O I
10.1504/IJEX.2012.049740
中图分类号
O414.1 [热力学];
学科分类号
摘要
The cement industry is one of the most intensive energy and cost industries in the world that consumes about 3800 MJ per tonne of cement produced. To achieve an effective energy management scheme, energy and exergy analyses were employed on the pyroprocessing unit of Gaziantep Cement Plant in Turkey. Energy and exergy efficiencies are determined to be 52.2% and 35.9%, respectively. Application of insulation on the unit reduced rate of heat loss from 22.7 MW to 17.3 MW. This in turn increases both the energy and the exergy efficiency values to 63.6% and 47.3%, respectively. The effect of weather conditions on the efficiency values is studied. It is estimated that 1056.7 kW of electricity can be generated by using the waste heat from the unit. The application of waste heat recovery steam generator prevents the emission of 5183 tons of CO2 to the atmosphere, representing a reduction of 8.2%.
引用
收藏
页码:152 / 172
页数:21
相关论文
共 24 条
  • [1] Energy and exergy analyses in a rotary burner with pre-calcinations in cement production
    Çamdali, Ü
    Erisen, A
    Çelen, M
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2004, 45 (18-19) : 3017 - 3031
  • [2] Cengel Y.A., 2003, Heat Transfer: A Practical Approach
  • [3] Cornelissen R.L., 1997, PhD thesis
  • [4] Dumas, 1990, APPL SCI, P109
  • [5] EIA, 2005, EL POW ANN 2005
  • [6] Characterization of cement plant emissions in Turkey
    Ekinci, E
    Munlafalioglu, I
    Pekin, AV
    [J]. WATER AIR AND SOIL POLLUTION, 1998, 106 (1-2) : 83 - 95
  • [7] Energy auditing and recovery for dry type cement rotary kiln systems - A case study
    Engin, T
    Ari, V
    [J]. ENERGY CONVERSION AND MANAGEMENT, 2005, 46 (04) : 551 - 562
  • [8] Analysis of energy-efficiency opportunities for the cement industry in Shandong Province, China: A case study of 16 cement plants
    Hasanbeigi, Ali
    Price, Lynn
    Lu, Hongyou
    Lan, Wang
    [J]. ENERGY, 2010, 35 (08) : 3461 - 3473
  • [9] Ignebekcili A., 2010, CEMT EUR C IST 26 29, P26
  • [10] Energy audit and conservation opportunities for pyroprocessing unit of a typical dry process cement plant
    Kabir, G.
    Abubakar, A. I.
    El-Nafaty, U. A.
    [J]. ENERGY, 2010, 35 (03) : 1237 - 1243