A revised model for compressor design and scheduling in gas-lifted oil fields

被引:12
作者
Camponogara, Eduardo [1 ]
Nazari, Luiz F. [1 ]
Meneses, Claudio N. [2 ]
机构
[1] Univ Fed Santa Catarina, Dept Automat & Syst Engn, BR-88040900 Florianopolis, SC, Brazil
[2] Fed Univ ABC, BR-09210170 Santo Andre, SP, Brazil
关键词
Facility location; mixed-integer non-linear programming; piecewise linearization; scheduling; oil fields; OPTIMIZATION; OPERATIONS;
D O I
10.1080/0740817X.2011.587866
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The design and real-time scheduling of lift-gas compressors in oil fields entails solving a mixed-integer non-linear problem that generalizes the facility location problem. This article presents a revised formulation that represents the constraints on compressor discharge pressure as a family of linear inequalities, which is shown to be tighter than a previous formulation. Mixed-integer linear approximations for these formulations are obtained by piecewise linearizing the non-linear functions, using binary variables and specially ordered set variables. Valid inequalities for compressor capacity along with separation and lifting procedures are proposed. The article also presents computational experiments comparing the formulations and evaluating the impact of cutting plane generation on solution speed.
引用
收藏
页码:342 / 351
页数:10
相关论文
共 27 条
[1]  
[Anonymous], 2005, Algorithm Design
[2]   FACETS OF KNAPSACK POLYTOPE FROM MINIMAL COVERS [J].
BALAS, E ;
ZEMEL, E .
SIAM JOURNAL ON APPLIED MATHEMATICS, 1978, 34 (01) :119-148
[3]  
Barber A., 2007, OILFIELD REV, V19, P18
[4]  
BEALE E. M. L., 1970, P 5 INT C OP RES, P447
[5]  
Bonami P, 2005, RC23771 IBM RES DIV
[6]   Optimizing gas-lift production of oil wells: piecewise linear formulation and computational analysis [J].
Camponogara, E ;
Nakashima, P .
IIE TRANSACTIONS, 2006, 38 (02) :173-182
[7]  
Camponogara Eduardo, 2007, Proceedings of the 3rd Annual IEEE Conference on Automation Science and Engineering, P436
[8]  
Camponogara E., 2008, INT C ENG OPT RIO DE
[9]   Compressor scheduling in oil fields [J].
Camponogara, Eduardo ;
de Castro, Melissa Pereira ;
Plucenio, Agustinho ;
Pagano, Daniel Juan .
OPTIMIZATION AND ENGINEERING, 2011, 12 (1-2) :153-174
[10]   An automation system for gas-lifted oil wells: Model identification, control, and optimization [J].
Camponogara, Eduardo ;
Plucenio, Agustinho ;
Teixeira, Alex F. ;
Campos, Sthener R. V. .
JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2010, 70 (3-4) :157-167