High nitrite accumulation and strengthening denitrification for old-age landfill leachate treatment using an autocontrol two-stage hybrid process

被引:11
作者
Bai, Tao [1 ]
Lei, Hengyi [1 ]
Yu, Guangwei [1 ]
Yu, Qiang [1 ]
Li, Zhong [1 ]
Li, Hualiang [1 ]
机构
[1] Sun Yat Sen Univ, Sch Environm Sci & Engn, Guangzhou 510275, Guangdong, Peoples R China
关键词
A two-stage hybrid bed reactor; Landfill leachate; Shortcut nitrification and denitrification; Automatic control; BIOLOGICAL NITROGEN REMOVAL; SIMULTANEOUS NITRIFICATION; AMMONIA CONCENTRATION; WASTE-WATER; SLUDGE; RATES;
D O I
10.1016/j.psep.2009.06.001
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An autocontrol two-stage hybrid process was developed to treat landfill leachate. Biological nitrogen removal with nitrification and denitrification via nitrite pathway was split into two stages. The first stage was designed for the high nitrite accumulation and was composed of two hybrid bed reactors (Hybrid I and Hybrid II) and a coagulation-flocculation reactor having effective volumes of 120 L and 80 L, respectively. The second stage was designed for strengthening denitrification and included a single 80 L reactor. The carriers of the hybrid bed reactors were composed of fixed multiple flexible carriers and suspended particle carriers. Dissolved oxygen (DO), pH value, oxidation-reduction potential (ORP) and temperature were used as online fuzzy control parameters of the automatic control system. The concentration of nitrite in Hybrid I and Hybrid II could reach 411 mg L-1 and 604 mg L-1, respectively. Ammonia removal has reached maximal rates of 0.061 kgNH(4)(+)-N (m(3) h)(-1) and 0.041 kgNH(4)(+)-N (m(3) h)(-1), respectively. A maximum nitrite removal rate of 0.211 kgNO(2)(-)-N(m(3) h)(-1) was observed during the strengthening denitrification. The running time of one cycle was not fixed and was actually controlled by the system. The results indicated that the running period was more closely related to influent ammonia concentration than influent COD concentration. The aeration times could be shortened and the energy could be saved. The autocontrol two-stage hybrid process is therefore an economical and effective way for landfill leachate treatment. (c) 2009 The Institution of Chemical Engineers. Published by Elsevier B.V. All rights reserved.
引用
收藏
页码:307 / 314
页数:8
相关论文
共 17 条
[11]   Anaerobic treatment of sludge from a nitrification-denitrification landfill leachate plant [J].
Maranon, E. ;
Castrillon, L. ;
Fernandez, Y. ;
Fernandez, E. .
WASTE MANAGEMENT, 2006, 26 (08) :869-874
[12]   Biological nitrogen removal with nitrification and denitrification via nitrite pathway [J].
Peng, Yongzhen ;
Zhu, Guibing .
APPLIED MICROBIOLOGY AND BIOTECHNOLOGY, 2006, 73 (01) :15-26
[13]   Nitrogen removal from pharmaceutical manufacturing wastewater with high concentration of ammonia and free ammonia via partial nitrification and denitrification [J].
Peng, YZ ;
Li, YZ ;
Peng, CY ;
Wang, SY .
WATER SCIENCE AND TECHNOLOGY, 2004, 50 (06) :31-36
[14]   Use pH and ORP as fuzzy control parameters of denitrification in SBR process [J].
Peng, YZ ;
Gao, JF ;
Wang, SY ;
Sui, MH .
WATER SCIENCE AND TECHNOLOGY, 2002, 46 (4-5) :131-137
[15]   Simultaneous nitrification and denitrification in an aerobic reactor with granular sludge originating from an upflow anaerobic sludge bed reactor [J].
Ruan, Wenquan ;
Hua, Zhaozhe ;
Chen, Jian .
WATER ENVIRONMENT RESEARCH, 2006, 78 (08) :792-796
[16]   Denitrification potential and rates of complex carbon source from dairy effluents in activated sludge system [J].
Sage, M. ;
Daufin, G. ;
Gesan-Guiziou, G. .
WATER RESEARCH, 2006, 40 (14) :2747-2755
[17]   Biodegradation rates in adapted surface water can be assessed following a preadaptation period with semi-continuous operation [J].
Toräng, L ;
Nyholm, N .
CHEMOSPHERE, 2005, 61 (01) :1-10