Learning on rework management of construction projects: a case study

被引:8
|
作者
Zhang, Shang [1 ,2 ]
Duan, Hongxia [3 ]
Zhao, Xianbo [4 ]
Xia, Bo [5 ]
Feng, Yingbin [6 ]
Galvin, Shane [7 ]
机构
[1] Suzhou Univ Sci & Technol, Dept Construct Management, Suzhou, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing, Peoples R China
[3] Suzhou Univ Sci & Technol, Sch Civil Engn, Suzhou, Peoples R China
[4] Cent Queensland Univ, Sch Engn & Technol, Sydney, NSW, Australia
[5] Queensland Univ Technol, Sci & Engn Fac, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
[6] Western Sydney Univ, Sch Comp Engn & Math, Penrith, NSW, Australia
[7] Univ South Wales, Sch Engn, Pontypridd, M Glam, Wales
关键词
Rework management; learning; general contractor; china; case study; ORGANIZATIONS; LESSONS; BENCHMARKING; MECHANISMS; KNOWLEDGE; IMPACT; COSTS;
D O I
10.1080/15623599.2018.1521361
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Effective rework management (RM) not only increases profitability but also enhances management competence of contractors. However, little research has been conducted to explore the learning nature of RM from the perspective of contractors. Based on a longitudinal case study of three construction projects, this paper aims to present a holistic analysis on the RM learning process from the experience of a small-to-medium (SM) general contractor (GC) in China to explore the underlying facts determining the effectiveness of RM practices. It was found that a variety of causes led to rework in the three projects, which highlighted the importance to enhance GC's learning capacity to effectively reduce rework. A conceptual RM learning framework (CRMLF), which consists of people, approach, process, tool and project environment, was developed based on the analysis of influential factors of successful learning within the RM domain. This paper is valuable for practitioners and academics to understand the inherent nature of RM to continuously improve the project performance.
引用
收藏
页码:246 / 260
页数:15
相关论文
共 50 条
  • [41] An empirical study of the complexity of requirements management in construction projects
    Jallow, Abdou
    Demian, Peter
    Baldwin, Andrew
    Anumba, Chimay
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (05) : 505 - +
  • [42] Case Analysis of Construction Management in Small Projects in Jeju, Korea
    Kaag, Sang-Chan
    Jang, Myunghoun
    INTERNATIONAL CONFERENCE ON CIVIL AND ENVIRONMENTAL ENGINEERING (ICCEE 2018), 2018, 65
  • [43] Balancing Environmental and Economic Objectives for In-Stream Construction Projects: A Case Study on Sediment Management
    Courtice, Gregory
    Bauer, Bernard
    ASCE Open: Multidisciplinary Journal of Civil Engineering, 2024, 2 (01):
  • [44] Implementing lean construction techniques and management methods in Chinese projects: A case study in Suzhou, China
    Xing, Weiqi
    Hao, Jian Li
    Qian, Liang
    Tam, Vivian W. Y.
    Sikora, Karol S.
    JOURNAL OF CLEANER PRODUCTION, 2021, 286
  • [45] Studying pandemic effects and mitigation measures on management of construction projects: Najaf City as a case study
    Alraie, Ameer A.
    Kadhum, Asaad M. Ali
    Kadhem, Ali Abbas
    OPEN ENGINEERING, 2023, 13 (01):
  • [46] Environmental Capabilities of Suppliers for Green Supply Chain Management in Construction Projects: A Case Study in Korea
    Kim, Moon Gyu
    Woo, Chungwon
    Rho, Jae Jeung
    Chung, Yanghon
    SUSTAINABILITY, 2016, 8 (01):
  • [47] Translate business strategy into projects by project portfolio management: A case study on Chinese construction enterprise
    Shi Yongdong
    Du Lanying
    Qu Bo
    Liu Lili
    Zhu Shanshan
    PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON CONSTRUCTION & REAL ESTATE MANAGEMENT, VOLS 1 AND 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 1106 - 1111
  • [48] Construction Parts in Building Projects: Definition and Case Study
    Zhao, Nanyu
    Kam, Calvin
    Lo, Jacqueline T. Y.
    Kim, Jung In
    Fischer, Martin
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (04)
  • [50] Investigating the client-related rework in building projects: The case of Singapore
    Hwang, Bon-Gang
    Zhao, Xianbo
    Goh, Khang Jin
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (04) : 698 - 708