Learning on rework management of construction projects: a case study

被引:8
|
作者
Zhang, Shang [1 ,2 ]
Duan, Hongxia [3 ]
Zhao, Xianbo [4 ]
Xia, Bo [5 ]
Feng, Yingbin [6 ]
Galvin, Shane [7 ]
机构
[1] Suzhou Univ Sci & Technol, Dept Construct Management, Suzhou, Peoples R China
[2] Chongqing Univ, Sch Civil Engn, Chongqing, Peoples R China
[3] Suzhou Univ Sci & Technol, Sch Civil Engn, Suzhou, Peoples R China
[4] Cent Queensland Univ, Sch Engn & Technol, Sydney, NSW, Australia
[5] Queensland Univ Technol, Sci & Engn Fac, Sch Civil Engn & Built Environm, Brisbane, Qld, Australia
[6] Western Sydney Univ, Sch Comp Engn & Math, Penrith, NSW, Australia
[7] Univ South Wales, Sch Engn, Pontypridd, M Glam, Wales
关键词
Rework management; learning; general contractor; china; case study; ORGANIZATIONS; LESSONS; BENCHMARKING; MECHANISMS; KNOWLEDGE; IMPACT; COSTS;
D O I
10.1080/15623599.2018.1521361
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Effective rework management (RM) not only increases profitability but also enhances management competence of contractors. However, little research has been conducted to explore the learning nature of RM from the perspective of contractors. Based on a longitudinal case study of three construction projects, this paper aims to present a holistic analysis on the RM learning process from the experience of a small-to-medium (SM) general contractor (GC) in China to explore the underlying facts determining the effectiveness of RM practices. It was found that a variety of causes led to rework in the three projects, which highlighted the importance to enhance GC's learning capacity to effectively reduce rework. A conceptual RM learning framework (CRMLF), which consists of people, approach, process, tool and project environment, was developed based on the analysis of influential factors of successful learning within the RM domain. This paper is valuable for practitioners and academics to understand the inherent nature of RM to continuously improve the project performance.
引用
收藏
页码:246 / 260
页数:15
相关论文
共 50 条
  • [21] Impact of construction-related rework on selected Ugandan public projects
    Kakitahi, John Muhumuza
    Alinaitwe, Henry Mwanaki
    Landin, Anne
    Mone, Simon James
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2016, 14 (02) : 238 - 251
  • [22] A Novel Method of Developing Construction Projects Schedule under Rework Scenarios
    Ma, Guofeng
    Jiang, Shan
    Zhu, Tiancheng
    Jia, Jianyao
    SUSTAINABILITY, 2019, 11 (20)
  • [23] REWORK IN HIGHWAY PROJECTS
    Forcada, Nuria
    Rusinol, Gerard
    Macarulla, Marcel
    Love, Peter E. D.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (04) : 455 - 465
  • [24] Strategic management tools in projects case construction project
    Department of Civil Engineering, Vaasan ammattikorkeakoulu, University of Applied Sciences, Wolffintie 30, 65200 Vaasa, Finland
    不详
    不详
    Int. J. Proj. Manage., 2007, 7 (659-665): : 659 - 665
  • [25] Information management systems on construction projects: case reviews
    Craig, Nigel
    Sommerville, James
    RECORDS MANAGEMENT JOURNAL, 2006, 16 (03) : 131 - +
  • [26] Strategic management tools in projects case construction project
    Naaranoja, Marja
    Haapalainen, Paivi
    Lonka, Heikki
    Proceedings of IRNOP VII Project Research Conference, 2006, : 28 - 35
  • [27] The costs of rework: insights from construction and opportunities for learning
    Love, Peter E. D.
    Smith, Jim
    Ackermann, Fran
    Irani, Zahir
    Teo, Pauline
    PRODUCTION PLANNING & CONTROL, 2018, 29 (13) : 1082 - 1095
  • [28] Strategic implementation of IT/IS projects in construction: a case study
    Stewart, RA
    Mohamed, S
    Daet, R
    AUTOMATION IN CONSTRUCTION, 2002, 11 (06) : 681 - 694
  • [29] Revitalising environmental, health and safety management in public sector construction projects - a case study
    Peckitt, Stephen
    Coppin, Stephen
    POLICY AND PRACTICE IN HEALTH AND SAFETY, 2005, 3 (02) : 63 - 76
  • [30] The hold-up problem in the management of construction projects: A case study of the Channel Tunnel
    Chang, Chen-Yu
    Ive, Graham
    International Journal of Project Management, 2007, 25 (04) : 394 - 404