Smart Job Scheduling with Backup System in Grid Environment

被引:0
|
作者
Al-Najjar, Hazem [1 ]
Jarrah, Moath [2 ]
机构
[1] Taibah Univ, Dept Comp, Coll Bader, Madina, Saudi Arabia
[2] Jordan Univ Sci & Technol, Dept Comp Engn, Irbid, Jordan
来源
2012 18th IEEE International Conference on Networks (ICON) | 2012年
关键词
Job Scheduling; Neural networks; Backfilling; SLOW-coordination; Grid computing; Jobs dependency;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
This paper investigates the problem of job scheduling in grid environments when dependencies between the submitted jobs exist. If a job is failed, all jobs depending on it will need to be restarted. In order to prevent that, a Dependency Resolution model with a backup system (DR-Backup) is designed. DR-Backup uses Back Propagation Neural Network (BPNN) to predict the weight of the jobs. Also, it uses an unsupervised neural network to classify the slaves (working machines) into a set of classes. Three statistical predictors were used to validate the BPNN predictor as follow: Ordinary Least Square Regression (OLSR), MARS regression and the Treenet Logistic Binary predictor. Results show that the OLSR has a higher prediction rate than the other models. DR-Backup model was compared with three methods in job scheduling: First Come First Serve (FCFS), Job Ranking Backfilling (JR-Backfilling) and SLOW-coordination. Results show that no algorithm can overcome all dynamics in the incoming jobs and any system has advantages and disadvantages depending on the jobs sample and the parameters that were taken in classifying incoming jobs.
引用
收藏
页码:210 / 215
页数:6
相关论文
共 50 条
  • [1] A Heuristic on Job Scheduling in Grid Computing Environment
    Baghban, Hojjat
    Rahmani, Amir Masoud
    GCC 2008: SEVENTH INTERNATIONAL CONFERENCE ON GRID AND COOPERATIVE COMPUTING, PROCEEDINGS, 2008, : 141 - +
  • [2] Improving job scheduling algorithms in a grid environment
    Lee, Yun-Han
    Leu, Seiven
    Chang, Ruay-Shiung
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2011, 27 (08): : 991 - 998
  • [3] SCHEDULING WITH JOB CHECKPOINT IN COMPUTATIONAL GRID ENVIRONMENT
    Nandagopal, Malarvizhi
    Gajalakshmi, S.
    Uthariaraj, V. Rhymend
    INTERNATIONAL JOURNAL OF MODELING SIMULATION AND SCIENTIFIC COMPUTING, 2011, 2 (03) : 299 - 316
  • [4] An ACO Approach to Job Scheduling in Grid Environment
    Kant, Ajay
    Sharma, Arnesh
    Agarwal, Sanchit
    Chandra, Satish
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, 2010, 6466 : 286 - 295
  • [5] EJS']JS Algorithm for Job Scheduling in Grid Environment
    Manikandan, K.
    Cherian, Jacob P.
    Scaria, Nikhil
    GLOBAL TRENDS IN INFORMATION SYSTEMS AND SOFTWARE APPLICATIONS, PT 2, 2012, 270 : 629 - 638
  • [6] Job Scheduling using Ant Colony Optimization in Grid environment
    Oshin
    Chhabra, Amit
    2016 INTERNATIONAL CONFERENCE ON ELECTRICAL, ELECTRONICS, AND OPTIMIZATION TECHNIQUES (ICEEOT), 2016, : 2845 - 2850
  • [7] A Hybrid Batch Job Scheduling Algorithm For Grid Environment
    Zahedani, Shirin Dehghani
    Dastghaibyfard, GholamHossin
    2014 4TH INTERNATIONAL CONFERENCE ON COMPUTER AND KNOWLEDGE ENGINEERING (ICCKE), 2014, : 763 - 768
  • [8] Load Balanced Job Scheduling Approach for Grid Environment
    Manimala, R.
    Suresh, P.
    2013 INTERNATIONAL CONFERENCE ON INFORMATION COMMUNICATION AND EMBEDDED SYSTEMS (ICICES), 2013, : 336 - 339
  • [9] Modified Min - Min Heuristic for Job Scheduling Based on QoS in Grid Environment
    Bawa, Rajesh Kumar
    Sharma, Gaurav
    2013 2ND INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT IN THE KNOWLEDGE ECONOMY (IMKE), 2013, : 166 - 171
  • [10] Robust Fault Tolerant Job Scheduling Approach In Grid Environment
    Balpande, Mangesh
    Shrawankar, Urmila
    2014 INTERNATIONAL CONFERENCE ON CIRCUITS, SYSTEMS, COMMUNICATION AND INFORMATION TECHNOLOGY APPLICATIONS (CSCITA), 2014, : 259 - 264