Single-machine common due-date scheduling with batch delivery costs and resource-dependent processing times

被引:46
|
作者
Yin, Yunqiang [1 ,2 ]
Cheng, T. C. E. [3 ]
Wu, Chin-Chia [4 ]
Cheng, Shuenn-Ren [5 ]
机构
[1] Zhejiang Univ, Coll Comp Sci, Hangzhou 310003, Zhejiang, Peoples R China
[2] E China Inst Technol, Coll Sci, Fuzhou, Jiangxi, Peoples R China
[3] Hong Kong Polytech Univ, Dept Logist & Maritime Studies, Kowloon, Hong Kong, Peoples R China
[4] Feng Chia Univ, Dept Stat, Taichung 40724, Taiwan
[5] Cheng Shiu Univ, Grad Inst Business Adm, Kaohsiung, Taiwan
基金
中国博士后科学基金; 中国国家自然科学基金;
关键词
scheduling; production planning; SEQUENCING PROBLEMS; BICRITERION APPROACH; TRADE-OFFS; ASSIGNMENT; ALLOCATION; TARDINESS; EARLINESS;
D O I
10.1080/00207543.2013.793424
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper we consider the problem of single-machine batch delivery scheduling with an assignable common due date and controllable processing times. The job processing time is either a linear or a convex function of the amount of a continuously divisible and non-renewable resource allocated to the job. Finished jobs are delivered in batches and there is no capacity limit on each delivery batch. The objective is to find a job sequence, a partition of the job sequence into batches, a common due date, and resource allocation that jointly minimise a cost function based on earliness, weighted number of tardy jobs, job holding, due-date assignment, batch delivery, makespan, and resource consumption. We provide some properties of the optimal solution, and show that the problem with the linear and convex resource consumption functions can be solved in and time, respectively. We also show that some special cases of the problem can be solved by lower-order algorithms.
引用
收藏
页码:5083 / 5099
页数:17
相关论文
共 50 条
  • [21] Optimal due-date assignment problem with learning effect and resource-dependent processing times
    Lu, Yuan-Yuan
    Li, Gang
    Wu, Yu-Bin
    Ji, Ping
    OPTIMIZATION LETTERS, 2014, 8 (01) : 113 - 127
  • [22] Due-date assignment and single machine scheduling with compressible processing times
    Hong Kong Polytechnic Univ, Kowloon, Hong Kong
    Int J Prod Econ, 1 (29-35):
  • [23] SINGLE-MACHINE BATCH SCHEDULING PROBLEM WITH JOB REJECTION AND RESOURCE DEPENDENT PROCESSING TIMES
    Huang, Weifan
    Wu, Chin-Chia
    Liu, Shangchia
    RAIRO-OPERATIONS RESEARCH, 2018, 52 (02) : 315 - 334
  • [24] COMMON DUE-DATE ASSIGNMENT AND SCHEDULING ON A SINGLE MACHINE WITH SEQUENCE-DEPENDENT SETUPS AND DISCRETELY CONTROLLABLE PROCESSING TIMES
    Ulugov, Akmal
    Shin, Jeong-Hoon
    Lee, Dong-Ho
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2018, 25 (05): : 580 - 589
  • [25] Common due-date assignment and scheduling on a single machine with sequence-dependent setups and discretely controllable processing times
    Ulugov, Akmal
    Shin, Jeong-Hoon
    Lee, Dong-Ho
    International Journal of Industrial Engineering : Theory Applications and Practice, 2018, 25 : 580 - 589
  • [26] Two-Agent Single-Machine Scheduling with Resource-Dependent Starting Times
    Liu, Peng
    Tian, Xiaoyu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2013, 2013
  • [27] Single-machine scheduling time-dependent jobs with resource-dependent ready times
    Zhu, Valerie C. Y.
    Sun, Linyan
    Sun, Linhui
    Li, Xiaohong
    COMPUTERS & INDUSTRIAL ENGINEERING, 2010, 58 (01) : 84 - 87
  • [28] GENETIC ALGORITHMS FOR SINGLE-MACHINE JOB SCHEDULING WITH COMMON DUE-DATE AND SYMMETRICAL PENALTIES
    LEE, CY
    JOURNAL OF THE OPERATIONS RESEARCH SOCIETY OF JAPAN, 1994, 37 (02) : 83 - 95
  • [29] Single-machine scheduling with learning effect and resource-dependent processing times in the serial-batching production
    Pei, Jun
    Liu, Xinbao
    Liao, Baoyu
    Pardalos, Panos M.
    Kong, Min
    APPLIED MATHEMATICAL MODELLING, 2018, 58 : 245 - 253
  • [30] Single-machine batch delivery scheduling with an assignable common due window
    Yin, Yunqiang
    Cheng, T. C. E.
    Hsu, Chou-Jung
    Wu, Chin-Chia
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2013, 41 (02): : 216 - 225