Demand flexibility versus physical network expansions in distribution grids

被引:88
作者
Spiliotis, Konstantinos [1 ,2 ,3 ]
Gutierrez, Ariana Isabel Ramos [1 ,2 ,4 ]
Belmans, Ronnie [1 ,2 ]
机构
[1] Katholieke Univ Leuven, ESAT ELECTA, Kasteelpk Arenberg 10 Box 2445, B-3001 Leuven, Belgium
[2] EnergyVile, Thor Pk 8300, B-3600 Genk, Belgium
[3] KIC InnoEnergy, High Tech Campus 69, NL-5656 AG Eindhoven, Netherlands
[4] VITO, Boeretang 200, B-2400 Mol, Belgium
关键词
Flexibility; Demand side management; Intermittent renewables; DSO; Network investment deferral; GENERATION; MODEL;
D O I
10.1016/j.apenergy.2016.08.145
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The volumes of intermittent renewable energy sources (RES) and electric vehicles (EVs) are increasing in grids across Europe. Undoubtedly, the distribution networks cope with congestion issues much more often due to distributed generation and increased network use. Such issues are often handled by unit re-dispatching in short term and grid expansion in long term. Re-dispatching is, however, not always an appropriate solution for local distribution networks since the limited generation units are mostly RES of uncontrollable volatility. Recovering the incurred investment costs on the other hand would trigger an increase of the network tariffs. A possible solution is to defer such an investment by utilizing the demand side resources. The FlexMart model, developed and suggested in this paper, provides the ability for the Distribution System Operator (DSO) to purchase demand flexibility offered by residential consumers. Two feeders with different topologies are tested and the ability of the suggested mechanism to provide benefits for the involved stakeholders, both the DSO and the consumers, is demonstrated. The developed empirical model, works as a long-term planning tool and has the ability to provide an optimal combination of physical expansions and flexibility dispatch to reassure the stable and secure operation of the grid. (C) 2016 Elsevier Ltd. All rights reserved.
引用
收藏
页码:613 / 624
页数:12
相关论文
共 47 条
[31]  
Papalexopoulos A, PICA C
[32]   Low carbon technologies as providers of operational flexibility in future power systems [J].
Pavic, Ivan ;
Capuder, Tomislav ;
Kuzle, Igor .
APPLIED ENERGY, 2016, 168 :724-738
[33]   Distributed generation: definition, benefits and issues [J].
Pepermans, G ;
Driesen, J ;
Haeseldonckx, D ;
Belmans, R ;
D'haeseleer, W .
ENERGY POLICY, 2005, 33 (06) :787-798
[34]   Impacts of Intermittent Renewables on Electricity Generation System Operation [J].
Perez-Arriaga, Ignacio J. ;
Batlle, Carlos .
ECONOMICS OF ENERGY & ENVIRONMENTAL POLICY, 2012, 1 (02) :3-17
[35]   AN EFFICIENT LOAD MODEL FOR ANALYZING DEMAND-SIDE MANAGEMENT IMPACTS [J].
RAHMAN, S ;
RINALDY .
IEEE TRANSACTIONS ON POWER SYSTEMS, 1993, 8 (03) :1219-1226
[36]  
Ramos A, 14 IAEE EUR C SUST E
[37]   Regulation of distribution network business [J].
Román, J ;
Gómez, T ;
Muñoz, A ;
Peco, J .
IEEE TRANSACTIONS ON POWER DELIVERY, 1999, 14 (02) :662-669
[38]  
Roos J., 1996, THESIS
[39]  
Schmalensee R, 2011, MIT FUTURE ELECT GRI
[40]  
Schmultzer J, IEEE VEH NETW C