Numerical study study on the response of ground movements to construction activities of a metro station using the pile-beam-arch method

被引:33
作者
Li, B. [1 ,3 ]
Wang, Z. Z. [2 ]
机构
[1] Wuhan Univ Technol, Sch Transportat, Wuhan, Hubei, Peoples R China
[2] Dalian Univ Technol, Sch Civil Engn, Dalian, Peoples R China
[3] Hubei Highway Engn Res Ctr, Wuhan, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Metro station; The pile-beam-arch method; Pilot tunnels; Ground surface settlement; Settlement control measures; SUBWAY STATION; EXCAVATION; SETTLEMENT;
D O I
10.1016/j.tust.2019.03.014
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper aims to investigate the issues associated with the pile-beam-arch method for construction of metro stations. First, a detailed description of the procedures involved in the construction of a metro station is given. Secondly, a three-dimensional numerical model is established by FLAC(3D) to simulate the main construction process in practice, which consists of three phases, the excavation of the pilot tunnels, the installation of the load-bearing system, and the removal of the soil inside the metro station. These phases are then divided into fifteen construction steps, at the end of which the resulting ground surface settlements are recorded and analyzed. Numerical results reveal that the resulting displacements can be divided into four categories, the tunneling-induced settlement, the settlement occurs in response to an increase in vertical pressure, the tunneling-induced settlement in the presence of the load-bearing system, and the settlement occurs in response to a decrease in vertical pressure. Thirdly, the effects of settlement control measures are evaluated and discussed. Lastly, the comparison between the simulated and observed ground surface settlements collected from the existing literature are used to illustrate the effects of dewatering and the construction of working shafts and connecting tunnels.
引用
收藏
页码:209 / 220
页数:12
相关论文
共 20 条
[1]   Feasibility evaluation for excavation of Naghshe Jahan Square subway station by underground methods [J].
Cherlo, Morteza Abdi ;
Hashemolhosseini, Hamid ;
Cheraghi, Masoud ;
Mahdevari, Saeed .
JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2013, 5 (06) :452-459
[2]   Safety risk identification system for metro construction on the basis of construction drawings [J].
Ding, L. Y. ;
Yu, H. L. ;
Li, Heng ;
Zhou, C. ;
Wu, X. G. ;
Yu, M. H. .
AUTOMATION IN CONSTRUCTION, 2012, 27 :120-137
[3]   Shallow tunnelling method (STM) for subway station construction in soft ground [J].
Fang, Qian ;
Zhang, Dingli ;
Wong, Louis Ngai Yuen .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 29 :10-30
[4]   Settlement and load transfer mechanism of pile group due to side-by-side twin tunnelling [J].
Hong, Y. ;
Soomro, M. A. ;
Ng, C. W. W. .
COMPUTERS AND GEOTECHNICS, 2015, 64 :105-119
[5]   Design and construction of a deep excavation in soft soils adjacent to the Shanghai Metro tunnels [J].
Hu, ZF ;
Yue, ZQ ;
Zhou, J ;
Tham, LG .
CANADIAN GEOTECHNICAL JOURNAL, 2003, 40 (05) :933-948
[6]  
Kaul K., 2010, CUT COVER METRO STRU
[7]   Numerical modeling of ground settlement control of large span underground metro station in Tehran Metro using Central Beam Column (CBC) structure [J].
Kivi, A. Valizadeh ;
Sadaghiani, M. H. ;
Ahmadi, M. M. .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 28 :1-9
[8]   Deformations during cut-and-cover construction of MUNI Metro Turnback project [J].
Koutsoftas, DC ;
Frobenius, P ;
Wu, CL ;
Meyersohn, D ;
Kulesza, R .
JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2000, 126 (04) :344-359
[9]   Numerical parametric study on stability and deformation of tunnel face reinforced with face bolts [J].
Li, Bin ;
Hong, Y. ;
Gao, Bo ;
Qi, Tai Yue ;
Wang, Zheng Zheng ;
Zhou, Ji Ming .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2015, 47 :73-80
[10]   Back analysis of grouted rock bolt pullout strength parameters from field tests [J].
Li, Bin ;
Qi, Taiyue ;
Wang Zhengzheng ;
Yang, Longwei .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2012, 28 :345-349