3D Point Cloud and BIM-Based Reconstruction for Evaluation of Project by As-Planned and As-Built

被引:22
作者
Kim, Seungho [1 ]
Kim, Sangyong [2 ]
Lee, Dong-Eun [3 ]
机构
[1] Yeungnam Univ Coll, Dept Architecture, 170 Hyeonchung Ro, Daegu 42415, South Korea
[2] Yeungnam Univ, Sch Architecture, 280 Daehak Ro, Gyongsan 38541, Gyeongbuk, South Korea
[3] Kyungpook Natl Univ, Sch Architecture & Civil Engn, Daehak Ro 80, Daegu 41566, South Korea
基金
新加坡国家研究基金会;
关键词
3D point cloud; reconstruction; as-planned; as-built; progress management; SCAN-TO-BIM; BUILDING INFORMATION; PROGRESS; MANAGEMENT; OPERATION; SYSTEM;
D O I
10.3390/rs12091457
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Progress management of a construction project can detect changes early by visualizing the progress of the project, as it is important to be capable of predicting the success or failure of future project objectives. However, to perform reliable progress management tasks, accurate measurement data is required. In this study, the basic principle of the evaluation of project progress was performed through the 3D point cloud and the 4D attributes of BIM. The evaluation of project progress proposed in this study was based on as-built data to assess the progress of the project site. The specific improvements via the proposed process for this study in the construction project-progress control area were as follows: (1) visualization of construction project progress, (2) calculation of project as-built quantity, and (3) evaluation of a project's progress. This study improved the efficiency and productivity in the management of a construction project through detection of the progress process. It provided easy monitoring of the overall project status, such as productivity analysis, progress rate and quality verifications, and easy identification of the problems created and foreseeable engineering tasks.
引用
收藏
页数:14
相关论文
共 41 条
[1]   Scan-to-BIM for 'secondary' building components [J].
Adan, Antonio ;
Quintana, Blanca ;
Prieto, Samuel A. ;
Bosche, Frederic .
ADVANCED ENGINEERING INFORMATICS, 2018, 37 :119-138
[2]  
[Anonymous], 2008, P ACM SIGMOD INT C M, DOI [10.1145/1376616.1376737, DOI 10.1145/13766161376737]
[3]  
[Anonymous], 2011, BIM HDB GUIDE BUILDI, DOI DOI 10.1002/9781119287568
[4]  
[Anonymous], 2006, THESIS
[5]  
[Anonymous], 2016, Thesis.
[6]  
Bayrak T., 2008, THESIS
[7]  
이승훈, 2010, [Journal of the Architectural Institute of Korea Structure & Construction, 대한건축학회논문집 구조계], V26, P79
[8]   The value of integrating Scan-to-BIM and Scan-vs-BIM techniques for construction monitoring using laser scanning and BIM: The case of cylindrical MEP components [J].
Bosche, Frederic ;
Ahmed, Mahmoud ;
Turkan, Yelda ;
Haas, Carl T. ;
Haas, Ralph .
AUTOMATION IN CONSTRUCTION, 2015, 49 :201-213
[9]   4-Plane congruent sets for automatic registration of as-is 3D point clouds with 3D BIM models [J].
Bueno, Martin ;
Bosche, Frederic ;
Gonzalez-Jorge, Higinio ;
Martinez-Sanchez, Joaquin ;
Arias, Pedro .
AUTOMATION IN CONSTRUCTION, 2018, 89 :120-134
[10]   Performance evaluation of ultra wideband technology for construction resource location tracking in harsh environments [J].
Cheng, T. ;
Venugopal, M. ;
Teizer, J. ;
Vela, P. A. .
AUTOMATION IN CONSTRUCTION, 2011, 20 (08) :1173-1184