Scheduling parallel production lines with resource constraints. 2. Decomposition algorithm

被引:25
作者
Lamba, N [1 ]
Karimi, IA [1 ]
机构
[1] Natl Univ Singapore, Dept Chem & Environm Engn, Singapore 117576, Singapore
关键词
Production lines;
D O I
10.1021/ie010010o
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
In the preceding paper, we presented a mixed-integer linear programming model (MILP) for scheduling operation in a multiproduct facility comprising multiple parallel semicontinuous production lines. In this part, we first perform a critical analysis of the model structure and its various constraints and the various solver options. Because, even after that effort, the model remains computationally expensive for large-scale industrial applications, we use it to develop an efficient two-step decomposition algorithm. The main idea behind this algorithm is to first generate several good, feasible item combinations by repeatedly solving the model with a minimum number of slots and then to compose a schedule using these item combinations. A computationally easier new model for sequencing and scheduling item combinations is derived from the original model. When applied to an industrial problem from a detergent plant, the new algorithm gives near-optimal solutions in far less time than the original model.
引用
收藏
页码:790 / 800
页数:11
相关论文
共 5 条
[1]  
Brooke A., 1998, GAMS USERS GUIDE
[2]  
*GAMS DEV CORP, 1999, 4 GAMS SOLV MAN
[3]   DETAILED SCHEDULING OF BATCH-PRODUCTION IN A CELL WITH PARALLEL FACILITIES AND COMMON RENEWABLE RESOURCES [J].
HINDI, KS ;
TOCZYLOWSKI, E .
COMPUTERS & INDUSTRIAL ENGINEERING, 1995, 28 (04) :839-850
[4]   Scheduling parallel production lines with resource constraints. 1. Model formulation [J].
Lamba, N ;
Karimi, IA .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2002, 41 (04) :779-789
[5]   SCHEDULING OF MULTIPURPOSE BATCH CHEMICAL-PLANTS WITH RESOURCE CONSTRAINTS [J].
TSIRUKIS, AG ;
PAPAGEORGAKI, S ;
REKLAITIS, GV .
INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 1993, 32 (12) :3037-3050