ITER vacuum vessel, in-vessel components and plasma facing materials

被引:18
作者
Ioki, K. [1 ]
Barabash, V. [1 ]
Cordier, J. [1 ]
Enoeda, M. [2 ]
Federici, G. [3 ]
Kim, B. C. [4 ]
Mazul, I. [5 ]
Merola, M. [1 ]
Morimoto, M. [1 ]
Nakahira, M. [2 ]
Pick, M. [1 ]
Rozov, V. [1 ]
Shimada, M. [1 ]
Suzuki, S. [2 ]
Ulrickson, M. [6 ]
Utin, Yu. [1 ]
Wang, X. [1 ]
Wu, S. [7 ]
Yu, J. [1 ]
机构
[1] ITER Org, F-13108 St Paul Les Durance, France
[2] JAEA, Naka, Ibaraki 3110193, Japan
[3] EFDA, D-85748 Garching, Germany
[4] NFRC, Taejon 305333, South Korea
[5] Efremov Inst, St Petersburg, Russia
[6] Sandia Natl Labs, Albuquerque, NM 87185 USA
[7] ASIPP, Hefei 230031, Anhui, Peoples R China
关键词
Vacuum vessel; Blanket; First wall; Cryostat; Divertor;
D O I
10.1016/j.fusengdes.2008.05.027
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The Vacuum vessel (VV) design is being developed in more detail considering manufacturing and assembly methods, and cost. Incorporating manufacturing studies being performed in cooperation with ITER Parties, the regular VV sector design has been nearly Finalized. Design of the neutral beam (NB) ports including duct liners has been developed. Design of the in-wall shielding has been developed in more detail considering the supporting structure and the assembly method. Additional ferromagnetic inserts to be installed in the outboard midplane region will minimize the maximum ripple and the toroidal field flux line fluctuation. Detailed Studies were carried out on the ITER vacuum vessel to define appropriate codes and standards in the context of ITER licensing in France. The blanket Module design has progressed in cooperation with participant teams. Fabrication of mock-ups for qualification testing is Under way and the tests will be performed in 2007-2008. The divertor activities have progressed with the aim of launching the procurement according to the ITER project schedule. (c) 2008 Elsevier B.V. All rights reserved.
引用
收藏
页码:787 / 794
页数:8
相关论文
共 10 条
[1]   Design and R&D progress of blanket attachments [J].
Elio, F ;
Ioki, K ;
Yamada, M ;
Strebkov, Y ;
Daenner, W ;
Akiba, M .
FUSION ENGINEERING AND DESIGN, 2003, 69 (1-4) :321-326
[2]   Design improvements and R&D achievements for vacuum vessel and in-vessel components towards ITER construction [J].
Ioki, K ;
Barabaschi, P ;
Barabash, V ;
Chiocchio, S ;
Daenner, W ;
Elio, F ;
Enoeda, M ;
Gervash, A ;
Ibbott, C ;
Jones, L ;
Krylov, V ;
Kuroda, T ;
Lorenzetto, P ;
Martin, E ;
Mazul, I ;
Merola, M ;
Nakahira, M ;
Rozov, V ;
Strebkov, Y ;
Suzuki, S ;
Tanchuk, V ;
Tivey, R ;
Utin, Y ;
Yamada, M .
NUCLEAR FUSION, 2003, 43 (04) :268-273
[3]  
IOKI K, 2007, P SFEN ITER 2007
[4]  
IOKI K, 2006, P IAEA FUS EN C
[5]  
IOKI K, 2004, P IAEA FUS EN C
[6]   Results from ITER vacuum vessel sector manufacturing development in Europe [J].
Jones, L. ;
Duhovnik, J. ;
Ginola, M. ;
Huttunen, J. ;
Ioki, K. ;
Junek, L. ;
Loewer, T. ;
Luconi, U. ;
Pick, M. ;
Sanguinetti, G. -P. ;
Slovacek, M. ;
Utin, Y. .
FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) :1942-1947
[7]   Six-party qualification program of FW fabrication methods for ITER blanket module procurement [J].
Loki, K. ;
Elio, F. ;
Barabash, V. ;
Chuyanov, V. ;
Rozov, V. ;
Wang, X. ;
Chen, J. ;
Wang, L. ;
Lorenzetto, P. ;
Peacock, A. ;
Enoeda, M. ;
Nishi, H. ;
Hong, B. G. ;
Jeong, Yh. ;
Gervash, A. ;
Mazul, I. ;
Tanaka, T. ;
Ulrickson, M. .
FUSION ENGINEERING AND DESIGN, 2007, 82 (15-24) :1774-1780
[8]  
MORIMOTO M, P ANS M 2006
[9]  
ONOZUKA M, 2005, NOT DEV VACUUM VESSE
[10]   Progress in the ITER Physics Basis - Chapter 1: Overview and summary [J].
Shimada, M. ;
Campbell, D. J. ;
Mukhovatov, V. ;
Fujiwara, M. ;
Kirneva, N. ;
Lackner, K. ;
Nagami, M. ;
Pustovitov, V. D. ;
Uckan, N. ;
Wesley, J. ;
Asakura, N. ;
Costley, A. E. ;
Donne, A. J. H. ;
Doyle, E. J. ;
Fasoli, A. ;
Gormezano, C. ;
Gribov, Y. ;
Gruber, O. ;
Hender, T. C. ;
Houlberg, W. ;
Ide, S. ;
Kamada, Y. ;
Leonard, A. ;
Lipschultz, B. ;
Loarte, A. ;
Miyamoto, K. ;
Mukhovatov, V. ;
Osborne, T. H. ;
Polevoi, A. ;
Sipps, A. C. C. .
NUCLEAR FUSION, 2007, 47 (06) :S1-S17