A Fuzzy Collaborative Sensor Network for Semiconductor Manufacturing Cycle Time Forecasting

被引:2
作者
Lin, Yu-Cheng [1 ]
Chen, Toly [2 ]
Wang, Yu-Cheng [1 ]
机构
[1] Overseas Chinese Univ, Dept Ind Engn & Management, Taichung 408, Taiwan
[2] Feng Chia Univ, Dept Ind Engn & Syst Management, Taichung 408, Taiwan
关键词
LOT-OUTPUT TIME; BACK-PROPAGATION NETWORK; FBPN-ENSEMBLE APPROACH; DUE-DATE ASSIGNMENT; SOM-FBPN; NEURAL APPROACH; WAFER; PREDICTION; SYSTEM; CLASSIFICATION;
D O I
10.1155/2013/257276
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Network based sensing has become an important field of research, and it is expected that new applications of remote sensing will be developed. A fuzzy collaborative sensor network is developed in this study to predict the cycle time of a job in a semiconductor manufacturing factory, which is an important task for the factory. In the fuzzy collaborative sensor network, each sensor detects the status of a particular job as well as various environmental conditions present in the factory and uses a fuzzy neural network to analyze the received information. Each sensor communicates its settings and forecasting results to other sensors with the aid of a central control unit. According to the experimental results, the aggregate forecasting performance was considerably improved through the sensors' collaboration.
引用
收藏
页数:7
相关论文
共 31 条
[1]   Tool wear condition monitoring using a sensor fusion model based on fuzzy inference system [J].
Aliustaoglu, Cuneyt ;
Ertunc, H. Metin ;
Ocak, Hasan .
MECHANICAL SYSTEMS AND SIGNAL PROCESSING, 2009, 23 (02) :539-546
[2]  
Born T., 2007, P SPIE, V6561
[3]  
Chen T., 2003, Applied Soft Computing, V2, P211, DOI 10.1016/S1568-4946(02)00066-2
[4]   A fuzzy-neural knowledge-based system for job completion time prediction and internal due date assignment in a wafer fabrication plant [J].
Chen, T. .
INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2009, 40 (08) :889-902
[5]   Job remaining cycle time estimation with a post-classifying fuzzy-neural approach in a wafer fabrication plant: a simulation study [J].
Chen, T. .
PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART B-JOURNAL OF ENGINEERING MANUFACTURE, 2009, 223 (08) :1021-1031
[6]  
CHEN T, 2013, MATH PROBL ENG, V2013
[7]  
Chen T., 2011, INT J FUZZY SYSTEM A, V1, P36