Evolution Dynamic of Intelligent Construction Strategy of Coal Mine Enterprises in China

被引:2
作者
Tian Yang [1 ]
Yang Xue [1 ]
Yang Juan [1 ]
Mao Kaikai [2 ]
Yao Yujia [1 ]
机构
[1] North China Univ Water Resources & Elect Power, Sch Management & Econ, Zhengzhou 450046, Peoples R China
[2] Henan Univ Econ & Law, Zhengzhou 450046, Peoples R China
基金
中国国家自然科学基金;
关键词
intelligent construction; coal mine; capacity replacement; stochastic evolutionary game; moran process; SAFETY REGULATION; SYSTEM; GAME; INFORMATION; SUPPORT; MODEL;
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
The intelligent construction of coal mining enterprises is the fundamental strategy to prevent and curb major coal mine accidents, and the core technical support to realize the high-quality development of the coal industry. Considering the intelligent construction of coal mining enterprises enabled by emerging information technologies such as 5G and artificial intelligence, this paper constructs a Moran process stochastic evolutionary game model of intelligent construction of coal mining enterprises. Based on the fixed point probability of the Moran process, the probability of successful invasion of the "intelligent construction" strategy and the "traditional production" strategy in the limited coal mining enterprise group is calculated. By comparing the probability of individual fixed point and the probability of neutral mutation, the dominant condition of the strategy under strong selection and weak selection is obtained. The research shows that external stochastic factors, the number and scale of enterprises, the intensity of capacity replacement and the cost-benefit of intelligent construction are the main factors affecting the intelligent construction behavior of coal mining enterprises. When the intelligent construction of coal mining enterprises is in the cultivation period, the intelligent construction of underground coal mines dominated by stochastic factors can be effectively promoted by increasing the intensity of capacity reduction replacement. For the open-pit coal mine dominated by expected payoffs, reducing the number of mining rights and improving the concentration of open-pit coal mining industry will have a better effect on promoting its intelligent cultivation process. When the intelligent construction of coal mining enterprises is in the mature stage, with the improvement of the cost and benefits of intelligent construction, "intelligent construction" strategy will become a general consensus of coal mining enterprises. In addition, this paper analyzes the relevant parameters through specific examples to verify the effectiveness of the conclusions, which provides a scientific basis for effectively accelerating the intelligent construction of coal mining enterprises and promoting the transformation and upgrading of the coal industry.
引用
收藏
页数:21
相关论文
共 50 条
  • [1] Research on Dynamic Mechanism of Green Coal Mine Construction
    Guo Jia
    Energy Engineering and Environment Engineering, 2014, 535 : 610 - 613
  • [2] Design and Research of Intelligent Safety Monitoring Robot for Coal Mine Shaft Construction
    Fu, Wenjun
    Xu, Ying
    Liu, Liangping
    Zhang, Liang
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [3] Who are root hazards? A research on optimization of safety training management in coal mine enterprises from data-driven perspective
    Fa, Ziwei
    Yan, Ke
    Qiu, Zunxiang
    Zhang, Yueqian
    Liu, Quanlong
    Li, Xinchun
    RESOURCES POLICY, 2024, 91
  • [4] Evaluation Model Research of Coal Mine Intelligent Construction Based on FDEMATEL-ANP
    He, Lin
    Yuan, Dongliang
    Ren, Lianwei
    Huang, Ming
    Zhang, Wenyu
    Tan, Jie
    SUSTAINABILITY, 2023, 15 (03)
  • [5] Dynamic simulation and control strategy exploration of the unsafe behavior of coal mine employees
    Li, Wanzhen
    Zhou, Lujie
    Hao, Jian
    Yu, Kai
    Chen, Jing
    Liu, Pingping
    Feng, Rui
    RESOURCES POLICY, 2023, 86
  • [6] Intelligent fault prediction with wavelet-SVM fusion in coal mine
    Han, Chengyang
    Zou, Guangui
    Yeh, Hen-Geul
    Gong, Fei
    Shi, Suzhen
    Chen, Hao
    COMPUTERS & GEOSCIENCES, 2025, 194
  • [7] Intelligent Calibration of a Heavy-Duty Mechanical Arm in Coal Mine
    Jia, Yunhong
    Zhang, Xiaodong
    Wang, Zhenchong
    Wang, Wei
    ELECTRONICS, 2020, 9 (08) : 1 - 18
  • [8] Analysis of Vegetation Coverage Evolution and Degradation under Coal Mine Construction in Permafrost Region
    Wang, Shengting
    Xu, Tianni
    Sheng, Yu
    Wang, Yiming
    Jia, Shuming
    Huang, Long
    ATMOSPHERE, 2022, 13 (12)
  • [9] Impact of LMX on Coal Mine Safety Culture in China
    Ma, Shuming
    Zhang, Jiangshi
    PROCEEDINGS OF THE 2015 AASRI INTERNATIONAL CONFERENCE ON CIRCUITS AND SYSTEMS (CAS 2015), 2015, 9 : 121 - 124
  • [10] Factors Influencing BIM Adoption for Construction Enterprises in China
    Zhang, Ruixue
    Tang, Yuyan
    Wang, Liang
    Wang, Zeyu
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020