A Hybrid Approach for Project Crashing Optimization Strategy with Risk Consideration: A Case Study for an EPC Project

被引:11
|
作者
Ou-Yang, Chao [1 ]
Chen, Wang-Li [2 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, 43 Sec 4,Keeling Rd, Taipei, Taiwan
[2] Natl Taiwan Univ Sci & Technol, Sch Management, 43 Sec 4,Keeling Rd, Taipei, Taiwan
关键词
COST-ANALYSIS;
D O I
10.1155/2019/9649632
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This study aims to develop and provide a comprehensive evaluation strategy for schedule-related variations and time-cost analysis for an engineering-procurement-construction (EPC) project. Time-cost analysis is an important aspect of project scheduling, particularly in long-term and costly EPC projects. In this study, a hybrid method is proposed for the time-cost optimization strategy evaluation of a project. Monte Carlo simulation is applied to determine contingency plans and realize the effective management of estimated schedule uncertainties. A mathematical integer linear programming optimization model coded using CPLEX is developed to assess appropriate strategies for project execution under time and cost constraints. A set of project evaluation optimization models considering risk and project crash plan and the relationship between crash cost and delay penalty is also developed for assessing project feasibility. The correlation between project risk and crashing strategy has seldom been evaluated simultaneously in previous research. This work fills this research gap by quantifying the feasibility of a project, with combined data on risk, schedule, and cost as evaluation indicators. It allows project managers to consider management issues and strategies before they implement projects. A practical example with numerical applications is presented to illustrate the contribution of the decision-making support mechanism, and several managerial insights are provided.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Hybrid approach for project portfolio selection based on the business strategy and the scoring model
    Benaija, Khadija
    Kjiri, Laila
    FIFTH INTERNATIONAL CONFERENCE ON THE INNOVATIVE COMPUTING TECHNOLOGY (INTECH 2015), 2015, : 106 - 111
  • [32] The make-up of project management elements as influenced by business strategy: A case study approach
    Srivannaboon, S
    Milosevic, DZ
    Technology Management: A Unifying Discipline for Melting the Boundaries, 2005, : 370 - 380
  • [33] Risk in project preparation - 'determining the project needs and the effects on the management strategy'
    Clegg, AM
    JOURNAL OF THE SOUTH AFRICAN INSTITUTE OF MINING AND METALLURGY, 2005, 105 (02): : 81 - 94
  • [34] EVALUATION OF INVESTMENT PROJECT FOR BIOMASS USAGE WITH RISK CONSIDERATION
    Repisky, Jozef
    Gracova, Maria
    7TH INTERNATIONAL SCIENTIFIC CONFERENCE RURAL DEVELOPMENT 2015: TOWARDS THE TRANSFER OF KNOWLEDGE, INNOVATIONS AND SOCIAL PROGRESS, 2015,
  • [35] Risk evaluation and control of EPC hydropower construction project in Vietnam
    Mai Sy Hung
    Qiong, Wang Jian
    Vu Hong Anh
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON CIVIL, TRANSPORTATION AND ENVIRONMENT, 2016, 78 : 206 - 215
  • [36] Risk consideration in the handling of a large scale engineering project
    Tse, C. K.
    Wong, W. M.
    Chu, C. H.
    INNOVATIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, VOLS 1 AND 2, 2008, : 1501 - +
  • [38] Environmental Risk Assessment of General Contractor's EPC Project
    Li, Wangqing
    Song, Li
    ADVANCED RESEARCH ON ENGINEERING MATERIALS, ENERGY, MANAGEMENT AND CONTROL, PTS 1 AND 2, 2012, 424-425 : 389 - 394
  • [39] Research on Building Risk Control System for Overseas EPC Project
    Zhang Yun
    Nie Guihua
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INNOVATION AND MANAGEMENT, VOLS I AND II, 2014, : 1501 - 1506
  • [40] A simheuristic for project portfolio optimization combining individual project risk, scheduling effects, interruptions, and project risk correlations
    Saiz, Miguel
    Calvet, Laura
    Juan, Angel A.
    Lopez-Lopez, David
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 198