Statistical Comparison of the Performance of Alternative Contracting Methods in Florida

被引:0
|
作者
Zhang, Yuanxin [1 ]
Minchin Jr, R. Edward [2 ]
Chini, Abdol [2 ]
Ptschelinzew, Lourdes [2 ]
机构
[1] Guangzhou Univ, Sch Management, Guangzhou, Peoples R China
[2] Univ Florida, Rinker Sch Construct Management, Gainesville, FL USA
基金
中国国家自然科学基金;
关键词
infrastructure; project delivery methods; bidding; construction manager; general contractor; design-build; PROJECT DELIVERY-SYSTEMS;
D O I
10.1177/03611981221137592
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This study empirically examines the performance of alternative contracting methods using data from 2,721 highway projects gathered from a Florida Department of Transportation database. Contracting methods can significantly influence the cost and time of highway projects, so it is essential to use appropriate contracting methods in highway projects, especially considering the huge current volume of work and great need for more lane miles and new bridges. The most widely used alternative contracting methods in horizontal construction include Design-Build Major, Design-Build Minor, Cost Plus Time, Incentive/Disincentive, Lump Sum, and No Excuse Bonus. These have been devised to overcome shortcomings of the conventional Design-Bid-Build (DBB) method; however, their actual performance in practice has not previously been rigorously studied. To fill this gap, we statistically analyze our sample of highway projects using the Shapiro-Wilk test, Levene's test, Kruskal-Wallis test, Wilcoxon-Mann-Whitney test, and Dunn's test for unequal sample sizes. Another unique contribution of this research is the analytical techniques employed, which led to more reliable results based on the large quantity of data gathered. We find that some contracting methods performed better than others in each cost category for cost and time, and based on average cost and time savings, but not all were confirmed statistically. All seven contracting methods performed better in achieving time reductions than cost reductions, and all methods were more effective in reducing the cost and time of projects worth less $20 million than those worth over $20 million.
引用
收藏
页码:893 / 906
页数:14
相关论文
共 50 条
  • [1] The Use and Performance of Alternative Contracting Methods on Small Highway Construction Projects
    Alleman, Douglas
    Antoine, Arthur
    Schrilla, Mia
    Molenaar, Keith
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 908 - 915
  • [2] Industry Attitudes toward Alternative Contracting for Highway Construction in Florida
    Chini, Abdol
    Ptschelinzew, Lourdes
    Minchin, R. Edward, Jr.
    Zhang, Yuanxin
    Shah, Dev
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (02)
  • [3] Performance Analysis of Alternative Contracting Methods for Highway Construction Projects: Case Study for Iran
    Noorzai, Esmatullah
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2020, 26 (02)
  • [4] Alternative Contracting Methods: Modeling and Assessing the Effects of Contract Type on Time-Cost-Change Performance
    Choi, Kunhee
    Yin, Yangtian
    Goehl, Darlene
    Jeong, H. David
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (01)
  • [5] Staffing needs and utilization for alternative contracting methods in highway design and construction
    Tran, Dai Q.
    Harper, Christofer M.
    Smadi, Adi M.
    Mohamed, Mamdouh
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2020, 27 (09) : 2163 - 2178
  • [6] Empirical Comparison of Statistical Pavement Performance Models
    Chu, Chih-Yuan
    Durango-Cohen, Pablo L.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2008, 14 (02) : 138 - 149
  • [7] Comparison and Validation of Statistical Methods for Predicting Power Outage Durations in the Event of Hurricanes
    Nateghi, Roshanak
    Guikema, Seth D.
    Quiring, Steven M.
    RISK ANALYSIS, 2011, 31 (12) : 1897 - 1906
  • [8] Statistical comparison of the performance of data-based models for sewer condition modeling
    Sousa, Vitor
    Matos, Jose P.
    Matias, Natercia
    Meireles, Ines
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (12) : 1680 - 1693
  • [9] Degradation analysis by statistical methods
    Leira, B
    Lingård, J
    Nesje, A
    Sund, E
    Sægrov, S
    DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 1436 - 1446
  • [10] Comparison of Cost and Time Performance of Design-Build and Design-Bid-Build Delivery Systems in Florida
    Minchin, R. Edward, Jr.
    Li, Xiaoxiao
    Issa, Raja R.
    Vargas, Gary G.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2013, 139 (10)