Exploring Pre-Construction Activities in Infrastructure Projects That Can Benefit from Contractor Involvement

被引:2
作者
Memic, Nadina [1 ]
Tadayon, Allen [1 ,2 ]
Olsson, Nils O. E. [3 ]
Wondimu, Paulos A. [1 ,4 ]
Ishtiaque, Tausif Ahmed [1 ]
Laedre, Ola [1 ]
机构
[1] Norwegian Univ Sci & Technol NTNU, Dept Civil & Environm Engn, N-7491 Trondheim, Norway
[2] Oslo Metropolitan Univ OsloMet, Dept Built Environm, N-0130 Oslo, Norway
[3] Norwegian Univ Sci & Technol NTNU, Dept Mech & Ind Engn, N-7491 Trondheim, Norway
[4] Norwegian Publ Rd Adm NPRA, N-0667 Oslo, Norway
关键词
ECI; infrastructure projects; pre-construction; activities; CRITICAL SUCCESS FACTORS; CONSTRUCTION PROJECTS; DESIGN PHASE; PERCEPTION;
D O I
10.3390/buildings13102569
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The pre-construction phase of public infrastructure projects is characterized by significant uncertainty as crucial decisions are made with limited information. This early stage of project development is influenced by a multitude of factors and input from various stakeholders. While early contractor involvement (ECI) offers potential benefits for both clients and projects, the timing and selection of tasks for involving the contractor are critical to achieving these benefits. This study seeks to identify key pre-construction activities in public infrastructure projects and pinpoint the activities that stand to gain the most from ECI. The research methodology involved conducting semi-structured interviews, organizing seven workshops, and conducting the literature and document studies. Through these efforts, the study identified a total of 20 pre-construction activities, among which 5 activities emerged as the most favorable candidates for ECI, while 5 others were deemed less suitable. The findings underscore a consensus that involving contractor expertise during the Brief Development sub-phase holds significant promise. Notably, activities associated with planning, environmental considerations, and technical aspects related to the scope clarification, were found to be highly amenable to ECI. Activities addressing uncertainty management received particular attention, with clients valuing contractors' practical experience in risk assessment and mitigation. Additionally, contractors' insights into planning, activity dependencies, and their contributions to health, safety, and environmental plans were highly regarded. However, activities, categorized under the more technical sub-phases of Concept Development and Detailed Engineering yielded mixed results, while those falling within the predominantly social and political domain and involving political processes and societal impact, were viewed as less suitable for early contractor involvement. These findings emphasize the need to adopt a systematic and consistent approach to pre-construction activities, highlighting that ECI should not be applied as a one-size-fits-all solution. The interview results somewhat contrast with the literature findings, which indicate that the early conceptual phase is most beneficial as the contractor impact is highest. To some extent, the client, contractor, and consultant still see their benefit and strategy before the good of the project.
引用
收藏
页数:24
相关论文
共 54 条
  • [1] Review on Application of Building Information Modelling in Interior Design Industry
    Abd Hamid, Abu Baker
    Embi, Mohamed Rashid
    [J]. 4TH INTERNATIONAL BUILDING CONTROL CONFERENCE 2016 (IBCC 2016), 2016, 66
  • [2] A project control process in pre-construction phases Focus on effective methodology
    Al-Reshaid, Khaled
    Kartam, Nabil
    Tewari, Narendra
    Al-Bader, Haya
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2005, 12 (04) : 351 - +
  • [3] Austin S., 2002, ENG CONSTR ARCHIT MA, V9, P249, DOI [DOI 10.1108/EB021220, 10.1108/eb021220]
  • [4] Facilitating Building Projects' Short-Term and Long-Term Value Creation
    Boge, Knut
    Haddadi, Amin
    Klakegg, Ole Jonny
    Salaj, Alenka Temeljotov
    [J]. BUILDINGS, 2021, 11 (08)
  • [5] Relationship Between Early Contractor Involvement and Financial Performance in the Rebuilding of Infrastructure in Christchurch, New Zealand
    Botha, Paul S.
    Scheepbouwer, Eric
    [J]. TRANSPORTATION RESEARCH RECORD, 2015, (2504) : 66 - 72
  • [6] Bygg21, 2015, Veileder for Fasenormen Neste StegEt Felles Rammeverk for Norske Byggeprosesser
  • [7] Road Construction Project Environmental Impact Assessment Scope Definition Using Project Definition Rating Index (PDRI)
    Chang, An-Pi
    Chou, Chien-Cheng
    Lin, Jyh-Dong
    Hsu, Chen-Yu
    [J]. INNOVATION AND SUSTAINABLE TECHNOLOGY IN ROAD AND AIRFIELD PAVEMENT, 2013, 723 : 885 - 892
  • [8] Strategic management in construction
    Chinowsky, PS
    Meredith, JE
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2000, 126 (01): : 1 - 9
  • [9] CII, 2013, PDRI Project Definition Rating Index-Infrastructure Projects
  • [10] Cooper D. R., 2014, Business research methods