Fast Frequency Response Reserve Planning for Power Systems Considering Homogeneous Extreme Risks

被引:0
|
作者
Li, Zifeng [1 ]
Li, Weidong [1 ]
Yu, Samson S. [2 ]
Guo, Litao [1 ]
Zheng, Huicong [1 ]
Ma, Jingwei
Zhao, Lin [3 ]
Dou, Wenlei [4 ]
Zhang, Na [3 ]
机构
[1] Dalian Univ Technol, Sch Elect Engn, Dalian 116024, Peoples R China
[2] Deakin Univ, Sch Engn, Melbourne, Vic 3220, Australia
[3] State Grid Liaoning Econ Res Inst, Shenyang 110015, Peoples R China
[4] State Grid Liaoning Elect Power Co Ltd, Shenyang 110006, Peoples R China
基金
中国国家自然科学基金;
关键词
Extreme events; FFRR economics; frequency nadir points; heterogeneous risk preference; reserve planning; risk homogeneity; SPINNING RESERVE; ENERGY; ELECTRICITY; PROVISION; EXPANSION;
D O I
10.1109/TIA.2022.3228512
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
To deal with the risk of frequency instability in the low-carbon emission power system, the fast frequency response reserve (FFRR) should be separately classified and rationally planned to ensure the reliability of the system. In FFRR planning, the frequency nadir under disturbances should be calculated quickly due to massive calculation in the probabilistic production simulation (PPS) to analyze the severity of disturbances. A set of corresponding analysis strategies need to be formulated due to the difficulty in accurately determining the loss of extreme events. In light of this, in this study, an analytical model of FFRR economics considering risk preference is proposed to evaluate the risk of rare and extreme events. The system operation state model is established based on the sequential Monte Carlo method, and the contingency set is sent into the proposed system frequency analytical model to obtain the frequency nadir. Considering the risk preference, a FFRR optimization planning and configuration method is proposed, in which the losses of extreme events can be appropriately accounted by considering the homogeneous extreme events separately. The risk preference essentially incorporates the operating experience into the calculation process, to avoid the homogenization of low-probability extreme events and improve the feasibility of the planning scheme. Simulation results show that the proposed FFRR planning and configuration scheme can avoid homogenizing small-probability extreme events, and the amount of FFRR demand is significantly increased when the operator concentrates on lower probability with high risk of extreme events.
引用
收藏
页码:2314 / 2325
页数:12
相关论文
共 43 条
  • [1] An Inertia Reserve Capacity Planning Method for Power Systems Considering Risk Preference
    Zhang, Na
    Li, Yongrui
    Ding, Qili
    Zhang, Xinggan
    Jiang, Haiwei
    Li, Weidong
    IEEE ACCESS, 2024, 12 : 87728 - 87741
  • [2] Determination of Maximum Wind Power Penetration Considering Wind Turbine Fast Frequency Response
    Rakhshani, Elyas
    Torres, Jose Luis Rueda
    Palensky, Peter
    van der Meijden, Mart
    2019 IEEE MILAN POWERTECH, 2019,
  • [3] The Role of Fast Frequency Response of Energy Storage Systems and Renewables for Ensuring Frequency Stability in Future Low-Inertia Power Systems
    Gonzalez-Inostroza, Pablo
    Rahmann, Claudia
    Alvarez, Ricardo
    Haas, Jannik
    Nowak, Wolfgang
    Rehtanz, Christian
    SUSTAINABILITY, 2021, 13 (10)
  • [4] Scheduling isolated power systems considering electric vehicles and primary frequency response
    Carron, Miguel
    Dominguez, Ruth
    Canas-Carreton, Miguel
    Zarate-Minano, Rafael
    ENERGY, 2019, 168 : 1192 - 1207
  • [5] The Planning and Evaluation Method of Power System Reserve Capacity Considering Risk Assessment
    Sun Jibo
    Wang Yanwei
    Yang Yinguo
    Jiang Jiangfeng
    Liu Fang
    Kou Yu
    Bie Zhaohong
    2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2016,
  • [6] Frequency-Constrained Stochastic Planning Towards a High Renewable Target Considering Frequency Response Support From Wind Power
    Li, Hao
    Qiao, Ying
    Lu, Zongxiang
    Zhang, Baosen
    Teng, Fei
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2021, 36 (05) : 4632 - 4644
  • [7] Potential of data centers for fast frequency response services in synchronously isolated power systems
    Al Kez, Dlzar
    Foley, Aoife M.
    Ahmed, Faraedoon W.
    O'Malley, Mark
    Muyeen, S. M.
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2021, 151
  • [8] Spinning Reserve Planning under Large Wind Power Penetration Considering Carbon Dioxide Fmission
    Kuo, Cheng-Chien
    2012 7TH INTERNATIONAL CONFERENCE ON COMPUTING AND CONVERGENCE TECHNOLOGY (ICCCT2012), 2012, : 1343 - 1348
  • [9] Chronological Power Flow for Planning Transmission Systems Considering Intermittent Sources
    Leite da Silva, Armando M.
    da Fonseca Manso, Luiz Antonio
    Sales, Warlley de Sousa
    Flavio, Silvan A.
    Anders, George J.
    de Resende, Leonidas Chaves
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (04) : 2314 - 2322
  • [10] A method for determination of spinning reserve in wind-thermal power systems considering wind power benefits
    Wang, Caixia
    Qiao, Ying
    Lu, Zongxiang
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2012, 36 (04): : 16 - 21