Managing the high capital cost of prefabricated construction through stakeholder collaboration: a two-mode network analysis

被引:10
作者
Zhang, Youxi [1 ]
Liu, Yu [2 ]
Yu, Rui [3 ]
Zuo, Jian [4 ]
Dong, Na [2 ]
机构
[1] Sichuan Univ, Chengdu, Peoples R China
[2] Sichuan Univ, Coll Architecture & Environm, Chengdu, Peoples R China
[3] Sichuan Kaiyuan Engn Project Management Consulting, Chengdu, Peoples R China
[4] Univ Adelaide, Sch Architecture & Built Environm, Adelaide, Australia
关键词
Prefabricated construction (PC); Cost influencing factors (CIFs); Stakeholder attributes; Two-mode network; Collaboration; OFF-SITE CONSTRUCTION; MANAGEMENT; BARRIERS; CHAIN;
D O I
10.1108/ECAM-04-2023-0392
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
PurposePrefabricated construction (PC) can benefit construction industry due to its high efficiency, energy saving, consumption reduction and safety. However, the high capital cost is a critical challenge hindering its development in China. The collaboration of PC stakeholders is conducive to improving cost management efficiency and optimizing resource allocation which has been ignored in previous studies. Therefore, this study aims to explore the collaboration paths of stakeholders in the process of solving critical cost influencing factors (CIFs) of PC to reduce costs.Design/methodology/approachFirstly, 25 CIFs and five main stakeholders that affect PC capital cost were identified through literature research and expert interviews. Then, questionnaires were used to investigate the relationship between stakeholders and CIFs from the perspectives of three stakeholder attributes of proximity, attitude and power, respectively. Finally, based on the survey data, three stakeholder-CIF networks from three attributes perspective and a comprehensive network were constructed and used for subsequent social network analysis.Findings(1) Stakeholders mainly show willingness and potential to collaborate on organization and management factors; (2) More stakeholders pay attention to incentive policies and the setting of prefabrication rates and assembly rates, while all stakeholders have the right to facilitate information and resource sharing in the PC supply chain; (3) The comprehensive network shows a core-periphery structure. As core stakeholders, contractor, designer and manufacturer are more likely to actively manage the 14 core CIFs.Originality/valueThis paper innovatively combined stakeholder and cost management in PC, and used two-mode network based on three stakeholder perspectives to reveal the collaboration potential and motivation of stakeholders in PC cost management. The findings not only provide guidance for stakeholders to find potential partners and optimize resource allocation in solving specific cost issues, but also facilitate stakeholders' sustainable collaboration to achieve PC's cost performance.
引用
收藏
页码:556 / 577
页数:22
相关论文
共 68 条
[1]   A Comprehensive Stakeholder-Typology Model Based on Salience Attributes in Construction Projects [J].
Bahadorestani, Amir ;
Karlsen, Jan Terje ;
Farimani, Nasser Motahari .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (09)
[2]   ALGORITHM FOR CLUSTERING RELATIONAL DATA WITH APPLICATIONS TO SOCIAL NETWORK ANALYSIS AND COMPARISON WITH MULTIDIMENSIONAL-SCALING [J].
BREIGER, RL ;
BOORMAN, SA ;
ARABIE, P .
JOURNAL OF MATHEMATICAL PSYCHOLOGY, 1975, 12 (03) :328-383
[3]   HIERARCHICAL CLUSTER ANALYSIS [J].
BRIDGES, CC .
PSYCHOLOGICAL REPORTS, 1966, 18 (03) :851-&
[4]   Identifying enablers for coordination across construction supply chain processes: a systematic literature review [J].
Chen, Qian ;
Hall, Daniel Mark ;
Adey, Bryan Tyrone ;
Haas, Carl Thomas .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (04) :1083-1113
[5]  
Cheng D., IOP C SERIES EARTH E
[6]   Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis [J].
Choi, Jin Ouk ;
O'Connor, James T. ;
Kim, Tae Wan .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (10)
[7]   The dual-projection approach for two-mode networks [J].
Everett, M. G. ;
Borgatti, S. P. .
SOCIAL NETWORKS, 2013, 35 (02) :204-210
[8]   Driving-paths of green buildings industry (GBI) from stakeholders' green behavior based on the network analysis [J].
Fu, Yanting ;
Dong, Na ;
Ge, Qi ;
Xiong, Feng ;
Gong, Cheng .
JOURNAL OF CLEANER PRODUCTION, 2020, 273
[9]   Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis [J].
Gan, Xiaolong ;
Chang, Ruidong ;
Wen, Tao .
JOURNAL OF CLEANER PRODUCTION, 2018, 201 :735-747
[10]   Prefabrication policies and the performance of construction industry in China [J].
Gao, Yue ;
Tian, Xian-Liang .
JOURNAL OF CLEANER PRODUCTION, 2020, 253