Time-dependent electric bus and charging station deployment problem

被引:4
作者
He, Yi [1 ,2 ]
Liu, Zhaocai [2 ]
Zhang, Yiming [1 ]
Song, Ziqi [1 ]
机构
[1] Utah State Univ, Civil & Environm Engn, Logan, UT 84322 USA
[2] Natl Renewable Energy Lab, Golden, CO 80401 USA
基金
美国国家科学基金会;
关键词
Battery electric buses; Time -dependent fleet transition; Declining battery and charger price; Charging station deployment; DEMAND; INFRASTRUCTURE; NETWORK; MODEL;
D O I
10.1016/j.energy.2023.128227
中图分类号
O414.1 [热力学];
学科分类号
摘要
Battery electric buses (BEBs) have gained popularity due to their emission-free and energy-efficient features. Many transit authorities worldwide have set goals to gradually replace their bus fleets with BEBs. Considering the potential decline in BEB battery and charger prices, this study proposes a time-dependent bus fleet transition model to determine the optimal bus fleet transition plan, which includes selecting the bus lines to be electrified, determining the timing and type of BEBs to be purchased, and deploying on-route fast chargers and depot chargers. The model is a bi-objective integer linear program that considers the trade-off between electrified transit mileages and bus electrification costs. A normalized normal constraint method is applied to solve the bi-objective optimization model. The effectiveness of the proposed model is tested using a real-world bus network. Additionally, sensitivity analyses are conducted to better understand the impact of different parameter values on the optimal solutions. Our proposed model can provide transit authorities with a powerful tool to make informed decisions about their BEB fleet replacement plans.
引用
收藏
页数:12
相关论文
共 45 条
[1]   Evaluating and Optimizing Opportunity Fast-Charging Schedules in Transit Battery Electric Bus Networks [J].
Abdelwahed, Ayman ;
van den Berg, Pieter L. ;
Brandt, Tobias ;
Collins, John ;
Ketter, Wolfgang .
TRANSPORTATION SCIENCE, 2020, 54 (06) :1601-1615
[2]   A novel integration of scheduling and dynamic wireless charging planning models of battery electric buses [J].
Alwesabi, Yaseen ;
Liu, Zhaocai ;
Kwon, Soongeol ;
Wang, Yong .
ENERGY, 2021, 230
[3]   Electric bus scheduling under single depot dynamic wireless charging infrastructure planning [J].
Alwesabi, Yaseen ;
Wang, Yong ;
Avalos, Raul ;
Liu, Zhaocai .
ENERGY, 2020, 213 (213)
[4]   Battery electric bus infrastructure planning under demand uncertainty [J].
An, Kun .
TRANSPORTATION RESEARCH PART C-EMERGING TECHNOLOGIES, 2020, 111 (111) :572-587
[5]  
Blanco S., 2019, FORBES 0418
[6]  
California Air Resources Board, 2018, CAL TRANS ALL EL PUB
[7]  
California Environmental Protection Agency, 2017, BATT COST HEAV DUT E
[8]  
Chicago Transit Authority, CTA UNV 1 EV ROADM C
[9]  
Colorado Department of Transportation, TRANS ZER EM VEH ROA
[10]   Normal-boundary intersection: A new method for generating the Pareto surface in nonlinear multicriteria optimization problems [J].
Das, I ;
Dennis, JE .
SIAM JOURNAL ON OPTIMIZATION, 1998, 8 (03) :631-657