Research on Profit-Sharing Mechanism of IPD Projects Considering Multidimensional Fairness Preferences and BIM

被引:1
作者
Wang, Lunyan [1 ,2 ]
Tao, Mengyu [3 ]
An, Xiaowei [3 ]
Dong, Guanghua [3 ]
机构
[1] North China Univ Water Resource & Elect Power, Coll Water Resources, Zhengzhou 450046, Peoples R China
[2] Henan Key Lab Water Environm Simulat & Treatment, Zhengzhou 450046, Peoples R China
[3] North China Univ Water Resource & Elect Power, Sch Water Conservancy, Zhengzhou 450046, Peoples R China
来源
SYSTEMS | 2023年 / 11卷 / 09期
关键词
integrated project delivery model; building information modeling; profit sharing; multidimensional fairness preferences; simulation; CONSTRUCTION; MODEL;
D O I
10.3390/systems11090477
中图分类号
C [社会科学总论];
学科分类号
03 ; 0303 ;
摘要
The integration of building information modeling (BIM) and the integrated project delivery (IPD) mode effectively promotes collaboration among project members and enhances project profitability. However, the issue of profit sharing significantly impacts the successful implementation of IPD projects. To enhance the profit-sharing mechanism of IPD projects and ensure their smooth implementation, a game analysis model of profit sharing in IPD projects was established based on the Stackelberg game theory, taking into account the multidimensional fair preferences of the participants and the application of BIM technology. Through simulation, the impact of various parameters of participants on output utility, total revenue, and sharing coefficient in IPD projects was analyzed. The results show that: (1) participants achieve their highest output utility and total revenue under vertical-horizontal fairness preferences; (2) under vertical fairness preferences, the profit sharing coefficient is the highest, while the output utility and total revenue are the lowest; (3) although the output utility and total revenue of participants under horizontal fairness preferences exceed those under neutral fairness preferences, the profit-sharing coefficient is lower; (4) the output utility, the total revenue, and the profit-sharing coefficient of the participants all increase with the increase in effort utility value and decrease with the increase in the effort cost coefficient and the risk avoidance coefficient. The research findings provide valuable theoretical support for the profit sharing of IPD projects, thereby further promoting the advancement and implementation of the IPD model.
引用
收藏
页数:25
相关论文
共 53 条
  • [1] Enhancement of IPD Characteristics as Impelled by Information and Communication Technology
    Ahmad, Irtishad
    Azhar, Nida
    Chowdhury, Arindam
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)
  • [2] Compensation mechanism for urban water environment treatment PPP project in China
    An, Xiaowei
    Li, Huimin
    Wang, Lunyan
    Wang, Zhuofu
    Ding, Jiyong
    Cao, Yongchao
    [J]. JOURNAL OF CLEANER PRODUCTION, 2018, 201 : 246 - 253
  • [3] [Anonymous], 2008, The Economic Benefits of the North American Polyvinyl Chloride Industry
  • [4] Arrow K. J., 1971, Essays in the Theory of Risk-Bearing
  • [5] Factors Influencing Integrated Project Delivery In Publicly Owned Construction Projects: An Information Modelling Perspective
    Azhar, Nida
    Kang, Youngcheol
    Ahmad, Irtishad U.
    [J]. FOURTH INTERNATIONAL SYMPOSIUM ON INFRASTRUCTURE ENGINEERING IN DEVELOPING COUNTRIES, (IEDC 2013), 2014, 77 : 213 - 221
  • [6] Bargaining optimization model for risk renegotiation with fairness concerns in infrastructure PPP projects
    Chen, Canjun
    Lv, Lelin
    Wang, Zhuofu
    Qiao, Ran
    [J]. ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (09) : 3876 - 3894
  • [7] Chen H.L., 2005, Chinas Ind. Econ, V8, P114, DOI [10.19581/j.cnki.ciejournal.2005.08.015, DOI 10.19581/J.CNKI.CIEJOURNAL.2005.08.015]
  • [8] Study of Risk Evaluation for Complex Projects under BIM and IPD Collaborative Pattern Based on Neighborhood Rough Sets
    Chen, Weibing
    Wang, Junwu
    Wang, Chengfu
    [J]. TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2020, 27 (02): : 444 - 449
  • [9] Team Integration and Owner Satisfaction: Comparing Integrated Project Delivery with Construction Management at Risk in Health Care Projects
    Choi, Jiyong
    Yun, Sungmin
    Leite, Fernanda
    Mulva, Stephen P.
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2019, 35 (01)
  • [10] Research on Profit Distribution of Logistics Alliance Considering Communication Structure and Task Completion Quality
    Dai, Panqian
    Xu, Jing
    Li, Wen
    [J]. PROCESSES, 2022, 10 (06)