Construction Safety Risk Assessment and Early Warning of Nearshore Tunnel Based on BIM Technology

被引:4
|
作者
Wu, Ping [1 ]
Yang, Linxi [1 ,2 ]
Li, Wangxin [1 ,3 ]
Huang, Jiamin [1 ,2 ]
Xu, Yidong [1 ]
机构
[1] NingboTech Univ, Sch Civil Engn & Architecture, Ningbo 315100, Peoples R China
[2] Chongqing Jiaotong Univ, Sch Civil Engn, Chongqing 400074, Peoples R China
[3] Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
关键词
nearshore tunnel; building information modeling technology; DS theory of evidence law; construction safety risk assessment; risk warning; ARTIFICIAL-INTELLIGENCE; MANAGEMENT; SYSTEM; FRAMEWORK; CHINA; SUPPORT; MODEL;
D O I
10.3390/jmse11101996
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The challenging nature of nearshore tunnel construction environments introduces a multitude of potential hazards, consequently escalating the likelihood of incidents such as water influx. Existing construction safety risk management methodologies often depend on subjective experiences, leading to inconsistent reliability in assessment outcomes. The multifaceted nature of construction safety risk factors, their sources, and structures complicate the validation of these assessments, thus compromising their precision. Moreover, risk assessments generally occur pre-construction, leaving on-site personnel incapable of recommending pragmatic mitigation strategies based on real-time safety issues. To address these concerns, this paper introduces a construction safety risk assessment approach for nearshore tunnels based on multi-data fusion. In addressing the issue of temporal effectiveness when the conflict factor K in traditional Dempster-Shafer (DS) evidence theory nears infinity, the confidence Hellinger distance is incorporated for improvement. This is designed to accurately demonstrate the degree of conflict between two evidence chains. Subsequently, an integrated evaluation of construction safety risks for a specific nearshore tunnel in Ningbo is conducted through the calculation of similarity, support degree, and weight factors. Simultaneously, the Revit secondary development technology is utilized to visualize risk monitoring point warnings. The evaluation concludes that monitoring point K7+860 exhibits a level II risk, whereas other monitoring points maintain a normal status.
引用
收藏
页数:26
相关论文
共 50 条
  • [31] BIM-integrated construction safety risk assessment at the design stage of building projects
    Lu, Ying
    Gong, Peizhen
    Tang, Yuchun
    Sun, Shuqi
    Li, Qiming
    AUTOMATION IN CONSTRUCTION, 2021, 124
  • [32] BIM-based digital platform and risk management system for mountain tunnel construction
    Liu, Naifei
    Guo, Desai
    Song, Zhanping
    Zhong, Shiming
    Hu, Ruoqi
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [33] Real-time safety early warning system for cross passage construction in Yangtze Riverbed Metro Tunnel based on the internet of things
    Ding, L. Y.
    Zhou, C.
    Deng, Q. X.
    Luo, H. B.
    Ye, X. W.
    Ni, Y. Q.
    Guo, P.
    AUTOMATION IN CONSTRUCTION, 2013, 36 : 25 - 37
  • [34] A dynamic Bayesian network based approach to safety decision support in tunnel construction
    Wu, Xianguo
    Liu, Huitao
    Zhang, Limao
    Skibniewski, Miroslaw J.
    Deng, Qianli
    Teng, Jiaying
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 134 : 157 - 168
  • [35] Construction of Risk Warning Model in Financial Market Based on Artificial Intelligence Technology
    Yu, Han
    FORTHCOMING NETWORKS AND SUSTAINABILITY IN THE IOT ERA (FONES-IOT 2021), VOL 2, 2022, 130 : 351 - 355
  • [36] Sensing and warning-based technology applications to improve occupational health and safety in the construction industry A literature review
    Antwi-Afari, Maxwell Fordjour
    Li, Heng
    Wong, Johnny Kwok-Wai
    Oladinrin, Olugbenga Timo
    Ge, Janet Xin
    Seo, JoonOh
    Wong, Arnold Yu Lok
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2019, 26 (08) : 1534 - 1552
  • [37] Methodologies of safety risk control for China's metro construction based on BIM
    Li, Meng
    Yu, Hongliang
    Jin, Hongyu
    Liu, Ping
    SAFETY SCIENCE, 2018, 110 : 418 - 426
  • [38] Early warning and risk assessment algorithm of school discipline inspection and supervision cases based on data mining technology
    Gu, Ying
    Li, Yawen
    Kuai, Yingping
    JOURNAL OF COMPUTATIONAL METHODS IN SCIENCES AND ENGINEERING, 2025,
  • [39] Using BIM in the safety risk management of modular construction
    Chatzimichailidou, Mikela
    Ma, Yue
    SAFETY SCIENCE, 2022, 154
  • [40] Construction risk control technology of a large tunnel complex in urban area
    Gao, Xinqiang
    Kong, Chao
    Wu, Daifeng
    Lu, Feng
    Liu, Maoyi
    Wang, Haiyan
    Ren, Songbo
    FRONTIERS IN EARTH SCIENCE, 2023, 10