Construction Safety Risk Assessment and Early Warning of Nearshore Tunnel Based on BIM Technology

被引:4
|
作者
Wu, Ping [1 ]
Yang, Linxi [1 ,2 ]
Li, Wangxin [1 ,3 ]
Huang, Jiamin [1 ,2 ]
Xu, Yidong [1 ]
机构
[1] NingboTech Univ, Sch Civil Engn & Architecture, Ningbo 315100, Peoples R China
[2] Chongqing Jiaotong Univ, Sch Civil Engn, Chongqing 400074, Peoples R China
[3] Lanzhou Univ Technol, Sch Civil Engn, Lanzhou 730050, Peoples R China
关键词
nearshore tunnel; building information modeling technology; DS theory of evidence law; construction safety risk assessment; risk warning; ARTIFICIAL-INTELLIGENCE; MANAGEMENT; SYSTEM; FRAMEWORK; CHINA; SUPPORT; MODEL;
D O I
10.3390/jmse11101996
中图分类号
U6 [水路运输]; P75 [海洋工程];
学科分类号
0814 ; 081505 ; 0824 ; 082401 ;
摘要
The challenging nature of nearshore tunnel construction environments introduces a multitude of potential hazards, consequently escalating the likelihood of incidents such as water influx. Existing construction safety risk management methodologies often depend on subjective experiences, leading to inconsistent reliability in assessment outcomes. The multifaceted nature of construction safety risk factors, their sources, and structures complicate the validation of these assessments, thus compromising their precision. Moreover, risk assessments generally occur pre-construction, leaving on-site personnel incapable of recommending pragmatic mitigation strategies based on real-time safety issues. To address these concerns, this paper introduces a construction safety risk assessment approach for nearshore tunnels based on multi-data fusion. In addressing the issue of temporal effectiveness when the conflict factor K in traditional Dempster-Shafer (DS) evidence theory nears infinity, the confidence Hellinger distance is incorporated for improvement. This is designed to accurately demonstrate the degree of conflict between two evidence chains. Subsequently, an integrated evaluation of construction safety risks for a specific nearshore tunnel in Ningbo is conducted through the calculation of similarity, support degree, and weight factors. Simultaneously, the Revit secondary development technology is utilized to visualize risk monitoring point warnings. The evaluation concludes that monitoring point K7+860 exhibits a level II risk, whereas other monitoring points maintain a normal status.
引用
收藏
页数:26
相关论文
共 50 条
  • [21] Food safety risk intelligence early warning based on support vector machine
    Zhang, Yu
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2020, 38 (06) : 6957 - 6969
  • [22] Safety-Risk Assessment for TBM Construction of Hydraulic Tunnel Based on Fuzzy Evidence Reasoning
    Zhang, Zhixiao
    Wang, Bo
    Wang, Xiangfeng
    He, Yintao
    Wang, Hanxu
    Zhao, Shunbo
    PROCESSES, 2022, 10 (12)
  • [23] BIM-based structural health monitoring and early warning for heritage timber structures
    Wang, Juan
    You, Hongyu
    Qi, Xin
    Yang, Na
    AUTOMATION IN CONSTRUCTION, 2022, 144
  • [24] CATIA-BASED BIM TECHNOLOGY IN HIGHWAY TUNNEL DESIGN
    Yang, Tao
    Lu, Yuquan
    Qin, Haiyang
    CIVIL ENGINEERING JOURNAL-STAVEBNI OBZOR, 2019, 28 (03): : 467 - 480
  • [25] Research on coal mine hidden danger analysis and risk early warning technology based on data mining in China
    Miao, Dejun
    Lv, Yueying
    Yu, Kai
    Liu, Lu
    Jiang, Jiachen
    PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2023, 171 : 1 - 17
  • [26] RESEARCH ON MANAGEMENT AND APPLICATION OF TUNNEL ENGINEERING BASED ON BIM TECHNOLOGY
    Song, ZhanPing
    Shi, GuiLin
    Wang, JunBao
    Wei, HaiMin
    Wang, Tao
    Zhou, GuanNan
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2019, 25 (08) : 785 - 797
  • [27] Water-Quality Assessment and Pollution-Risk Early-Warning System Based on Web Crawler Technology and LSTM
    Guan, Guoliang
    Wang, Yonggui
    Yang, Ling
    Yue, Jinzhao
    Li, Qiang
    Lin, Jianyun
    Liu, Qiang
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (18)
  • [28] Safety Risk Assessment of Prefabricated Buildings Hoisting Construction: Based on IHFACS-ISAM-BN
    Wang, Junwu
    Guo, Feng
    Song, Yinghui
    Liu, Yipeng
    Hu, Xuan
    Yuan, Chunbao
    BUILDINGS, 2022, 12 (06)
  • [29] Research on construction engineering safety early warning based on BP neural network
    Liu L.
    Wang X.
    Zhang C.
    Li X.
    International Journal of Wireless and Mobile Computing, 2022, 22 (3-4) : 281 - 289
  • [30] Application research of deep learning-based BIM Technology in Intelligent Construction
    Tao, Liang
    Zou, Leirong
    Gao, Zhaohong
    INTERNATIONAL JOURNAL OF LOW-CARBON TECHNOLOGIES, 2024, 19 : 2249 - 2257