Experimental investigation on fire damage to staggered segmental lining of shield tunnel

被引:16
作者
Chen, Hongbin [1 ]
Liu, Teng [2 ]
You, Xinhua [1 ]
Yuan, Dajun [2 ]
Ping, Yang [1 ]
Zhang, Qinglin [1 ]
机构
[1] China State Construct Engn Corp Ltd, Beijing 100029, Peoples R China
[2] Beijing Jiaotong Univ, Tunnel & Underground Engn Res Ctr, Minist Educ, Beijing 100044, Peoples R China
关键词
Shield tunnel; Staggered segmental lining; Tunnel fire; Temperature evolution; Physical damage; Mechanical behaviour; ROAD-TUNNEL; REINFORCED-CONCRETE; HIGHWAY TUNNELS; BEHAVIOR; SAFETY; PERCEPTION; PROTECTION; STRENGTH; RAILWAY; DESIGN;
D O I
10.1016/j.tust.2023.105359
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Fire is a significant hazard to the safe operation of tunnels, causing extensive damage and deterioration to the lining. This research proposed a prototype test of a shield tunnel staggered segmental lining under stratum loads subjected to fire. The fire followed the ISO834 standard curve; the maximum temperature reached 1144.9 degrees C and lasted 195 min. The temperature evolution law of the lining is positively correlated with the distance from the fire source and negatively correlated with the depth of the lining. The fire surface of the lining undergoes severe cracking and peeling, accompanied by water seepage and water vapour escaping during the fire. The concrete spalled severely on the fire surface of the lining, the maximum depth and area reached 65 mm and 3.05 m2, respectively, and the reinforcement near the fire source was exposed after the fire. The mechanical behaviour of the entire lining was damaged by fire, and that in the fire area was more significant than that in the non-fire area, and the damage degree of the joint was more significant than the segment. Every mechanical parameter of the lining changes significantly during the firing process and only partially recovers during the cooling, with significant residual values. The ultimate bearing capacity of the lining after being damaged by fire was about two times the preset stratum load. And the failure characteristic of the lining damaged by fire was the plastic failure of the joints in the fire area. Specifically, in the fire area, there were numerous wide cracks, some joints were crushed, and some inner reinforcement yielded, while in the non-fire area, there were only a few micro-cracks on the segment and a few cracks on the joints. The research conclusions can also provide a reference for the post disaster assessment of tunnel fire.
引用
收藏
页数:17
相关论文
共 62 条
[1]   Thermal behaviour of unloaded concrete tunnel lining through an innovative large-scale tunnel fire experimental testing setup [J].
Alhawat, Husen ;
Hamid, R. ;
Baharom, S. ;
Azmi, M. R. ;
Kaish, A. B. M. A. .
CONSTRUCTION AND BUILDING MATERIALS, 2021, 283
[2]  
American Society for Testing and Materials, 2001, E11901 AM SOC TEST M
[3]  
[Anonymous], 2015, China Journal of Highway and Transport, V28, P1
[4]  
Bettelini M., 2004, P INT S CAT TUNN FIR, P49
[5]   An experimental evaluation to determine the required thickness of passive fire protection layer for high strength concrete tunnel segments [J].
Bezgin, Niyazi Ozgur .
CONSTRUCTION AND BUILDING MATERIALS, 2015, 95 :279-286
[6]   Structural Fire Safety of Circular Concrete Railroad Tunnel Linings [J].
Caner, A. ;
Boncu, A. .
JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 2009, 135 (09) :1081-1092
[7]   Fire incident data for Australian road tunnels [J].
Casey, Nigel .
FIRE SAFETY JOURNAL, 2020, 111
[8]   A multi-purpose prototype test system for mechanical behavior of tunnel supporting structure: Development and application [J].
Chen, Hongbin ;
You, Xinhua ;
Yuan, Dajun ;
Ping, Yang .
JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2023, 15 (02) :467-476
[9]   A holistic numerical approach to simulating the thermal and mechanical behaviour of a tunnel lining subject to fire [J].
Choi, Soon-Wook ;
Lee, Junhwan ;
Chang, Soo-Ho .
TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2013, 35 :122-134
[10]  
[代洪波 Dai Hongbo], 2022, [隧道建设(中英文), Tunnel Construction], V42, P757