ARTIFICIAL INTELLIGENCE APPLICATIONS IN PROJECT SCHEDULING: A SYSTEMATIC REVIEW, BIBLIOMETRIC ANALYSIS, AND PROSPECTS FOR FUTURE RESEARCH

被引:10
作者
Bahroun, Zied [1 ]
Tanash, Moayad [2 ]
As'ad, Rami [1 ]
Alnajar, Mohamad [1 ]
机构
[1] Amer Univ Sharjah, Dept Ind Engn, PO Box 26666, Sharjah, U Arab Emirates
[2] Hashemite Univ, Dept Ind Engn, PO Box 33012, Zarqa, Jordan
关键词
Artificial intelligence; machine learning; project scheduling; bibliometric analysis; network analysis; review; RESOURCE-CONSTRAINED PROJECTS; GENETIC ALGORITHM; NEURAL-NETWORKS; CONSTRUCTION TIME; ADAPTIVE SEARCH; OPTIMIZATION; MANAGEMENT; COCITATION; HEURISTICS; KNOWLEDGE;
D O I
10.2478/mspe-2023-0017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The availability of digital infrastructures and the fast-paced development of accompanying revolutionary technologies have triggered an unprecedented reliance on Artificial intelligence (AI) techniques both in theory and practice. Within the AI domain, Machine Learning (ML) techniques stand out as essential facilitator largely enabling machines to possess human-like cognitive and decision making capabilities. This paper provides a focused review of the literature addressing applications of emerging ML tools to solve various Project Scheduling Problems (PSPs). In particular, it employs bibliometric and network analysis tools along with a systematic literature review to analyze a pool of 104 papers published between 1985 and August 2021. The conducted analysis unveiled the top contributing authors, the most influential papers as well as the existing research tendencies and thematic research topics within this field of study. A noticeable growth in the number of relevant studies is seen recently with a steady increase as of the year 2018. Most of the studies adopted Artificial Neural Networks, Bayesian Network and Reinforcement Learning techniques to tackle PSPs under a stochastic environment, where these techniques are frequently hybridized with classical metaheuristics. The majority of works (57%) addressed basic Resource Constrained PSPs and only 15% are devoted to the project portfolio management problem. Furthermore, this study clearly indicates that the application of AI techniques to efficiently handle PSPs is still in its infancy stage bringing out the need for further research in this area. This work also identifies current research gaps and highlights a multitude of promising avenues for future research.
引用
收藏
页码:144 / 161
页数:18
相关论文
共 148 条
[1]  
Adamu P.I. a. A.O.T., 2018, LECT NOTES ENG COMPU
[2]   A New Priority Rule for Solving Project Scheduling Problems [J].
Adamu, Patience I. ;
Okagbue, Hilary I. ;
Oguntunde, Pelumi E. .
WIRELESS PERSONAL COMMUNICATIONS, 2019, 106 (02) :681-699
[3]   Augmented neural networks for task scheduling [J].
Agarwal, A ;
Pirkul, H ;
Jacob, VS .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2003, 151 (03) :481-502
[4]   A Neurogenetic approach for the resource-constrained project scheduling problem [J].
Agarwal, Anurag ;
Colak, Selcuk ;
Erenguc, Selcuk .
COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) :44-50
[5]  
Alcaraz J., 2004, Proceedings of the ninth international workshop on project management and scheduling, P40
[6]  
Alostad Jasem M., 2020, International Journal of Internet Technology and Secured Transactions, V10, P322
[7]  
Ashby MF., 1998, Engineering Materials (Second Edition), piv, DOI DOI 10.1016/B978-0-08-054565-3.50002-2
[8]   Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling [J].
Awada, Mohamad ;
Srour, F. Jordan ;
Srour, Issam M. .
JOURNAL OF MANAGEMENT IN ENGINEERING, 2021, 37 (01)
[9]   A REVIEW OF MACHINE LEARNING IN SCHEDULING [J].
AYTUG, H ;
BHATTACHARYYA, S ;
KOEHLER, GJ ;
SNOWDON, JL .
IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 1994, 41 (02) :165-171
[10]  
Balyen L., 2019, ASIA-PAC J OPHTHALMO, V8