An integrated chance-constrained stochastic model for a preemptive multi-skilled multi-mode resource-constrained project scheduling problem: A case study of building a sports center

被引:11
作者
Mirnezami, Seyed-Ali [1 ]
Tavakkoli-Moghaddam, Reza [2 ]
Shahabi-Shahmiri, Reza [2 ]
Ghasemi, Mohammad [1 ]
机构
[1] Shahed Univ, Fac Engn, Dept Ind Engn, Tehran, Iran
[2] Univ Tehran, Coll Engn, Sch Ind Engn, Tehran, Iran
关键词
Project scheduling problem; Multiple skills; Activity preemption; Chance-constrained programming; Uncertainty; GENETIC ALGORITHM; LOCAL SEARCH; TIME; OPTIMIZATION; UNCERTAINTY; RISK; CLASSIFICATION; IMPLEMENTATION; SELECTION; NETWORK;
D O I
10.1016/j.engappai.2023.106726
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
A multi-mode resource-constrained project scheduling problem (MRCPSP) with multiple skills is investigated in this paper. Unlike the traditional form of this problem, and considering the real-world project circumstances, project activities can be preempted. In this paper, a new multi-objective mixed-integer linear programming (MILP) model with three objective functions is extended. These objectives are: (1) minimizing the project makespan, (2) minimizing the total resource costs, and (3) minimizing the total project risk. Based on real-life projects, non-renewable resources are represented as an uncertain stochastic parameter. To cope with the uncertain environment, chance-constrained programming with a confidence level is considered. A real-world construction project of a sports center in Tehran is utilized to demonstrate the applicability of the presented formulation. A well-known lexicographic optimization method, namely AUGMECON2, is applied to solve the proposed formulation with three objectives. Ultimately, for the case study and two datasets J30 and MM50, the proposed lexicographic optimization algorithm is compared with an efficient multi-objective mathematical programming technique known as the AUGMECON method. The comparison is based on performance metrics (i.e., IGD and HV) commonly used in multi-objective optimization. The results show the relative dominance of the proposed lexicographic optimization algorithm over the AUGMECON method in all sizes of the problem instances.
引用
收藏
页数:15
相关论文
共 75 条
[1]   Resource constrained project scheduling problem with setup times after preemptive processes [J].
Afshar-Nadjafi, Behrouz ;
Majlesi, Mahyar .
COMPUTERS & CHEMICAL ENGINEERING, 2014, 69 :16-25
[2]   An interactive fuzzy programming approach for bi-objective straight and U-shaped assembly line balancing problem [J].
Alavidoost, M. H. ;
Babazadeh, Hossein ;
Sayyari, S. T. .
APPLIED SOFT COMPUTING, 2016, 40 :221-235
[3]  
[Anonymous], 1988, THESIS U MICHIGAN
[4]  
[Anonymous], 1986, Theory, Computation, And Application
[5]   An optimization model for construction project scheduling by considering CO2 emissions with multi-mode resource constraints under interval-valued fuzzy uncertainty [J].
Aramesh, S. ;
Mousavi, S. M. ;
Ghasemi, M. ;
Shahabi-Shahmiri, R. .
INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2023, 20 (01) :87-102
[6]   Fuzzy resource-constrained project scheduling using taboo search algorithm [J].
Atli, Omer ;
Kahraman, Cengiz .
INTERNATIONAL JOURNAL OF INTELLIGENT SYSTEMS, 2012, 27 (10) :873-907
[7]   Pre-emption in resource-constrained project scheduling [J].
Ballestin, Francisco ;
Valls, Vicente ;
Quintanilla, Sacramento .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 189 (03) :1136-1152
[8]   A robust optimization approach for the multi-mode resource-constrained project scheduling problem [J].
Balouka, Noemie ;
Cohen, Izack .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2021, 291 (02) :457-470
[9]  
Barghi B., 2022, OPERATIONS RES FORUM, V3, P1
[10]   SCHEDULING SUBJECT TO RESOURCE CONSTRAINTS - CLASSIFICATION AND COMPLEXITY [J].
BLAZEWICZ, J ;
LENSTRA, JK ;
KAN, AHGR .
DISCRETE APPLIED MATHEMATICS, 1983, 5 (01) :11-24